THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WESTMORELAND X-A001(005), 15867 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: APRIL 18, 2013 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 12 IN WESTMORELAND COMPLETION DATE: JUNE 27, 2014 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,972,302.43 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 3,033,899.41 C THE LANE CONSTRUCTION CORPORATION 90 FIELDSTONE COURT, CHESHIRE, CT 06410 $ 3,538,805.17 D FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 3,546,761.51 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.881 INVASIVE SPECIES CONTROL TYPE I SY 600. 1.50 900.00 5.00 3,000.00 5.00 3,000.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 35. 2.00 70.00 25.00 875.00 20.00 700.00 202.31 FILL ABANDONED PIPE CY 30. 135.00 4,050.00 150.00 4,500.00 75.00 2,250.00 202.341 REMOVAL AND HANDLING/ SEGREGATING SOLID WASTE (<1% ASBESTOS) CY 4. 1,250.00 5,000.00 1,500.00 6,000.00 400.00 1,600.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 5. 32.00 160.00 50.00 250.00 60.00 300.00 202.7 REMOVAL OF GUARDRAIL LF 8,500. .50 4,250.00 1.00 8,500.00 1.25 10,625.00 203.1 COMMON EXCAVATION CY 960. 15.00 14,400.00 12.00 11,520.00 20.00 19,200.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 15. 700.00 10,500.00 1,250.00 18,750.00 1,000.00 15,000.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 5. 700.00 3,500.00 1,250.00 6,250.00 1,000.00 5,000.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 4. 600.00 2,400.00 1,000.00 4,000.00 750.00 3,000.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 5. 600.00 3,000.00 1,000.00 5,000.00 750.00 3,750.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,300. 6.00 7,800.00 8.00 10,400.00 5.00 6,500.00 203.92 ROCK SCALING MACHINE METHOD HR 20. 500.00 10,000.00 500.00 10,000.00 325.00 6,500.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 100.00 2,000.00 50.00 1,000.00 33.00 660.00 211.11 VIBRATION MONITORING SERVICES HR 50. 120.00 6,000.00 125.00 6,250.00 125.00 6,250.00 214. FINE GRADING U 1. 50,000.00 50,000.00 25,000.00 25,000.00 48,000.00 48,000.00 15867 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 140. 35.00 4,900.00 20.00 2,800.00 32.00 4,480.00 306.212 RECLAIMED STABILIZED BASE REMOVED AND REHANDLED 12 IN DEEP (F) SY 58,100. .90 52,290.00 1.00 58,100.00 4.00 232,400.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 5,900. 25.00 147,500.00 18.00 106,200.00 14.50 85,550.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 20,300. 67.00 1,360,100.00 70.00 1,421,000.00 77.00 1,563,100.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 265. 110.00 29,150.00 110.00 29,150.00 85.00 22,525.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 20,300. 1.30 26,390.00 1.25 25,375.00 1.25 25,375.00 403.6 PAVEMENT JOINT ADHESIVE LF 183,317. .12 21,998.04 .23 42,162.91 .01 1,833.17 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 19. 250.00 4,750.00 150.00 2,850.00 180.00 3,420.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 77. 250.00 19,250.00 100.00 7,700.00 180.00 13,860.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 8. 110.00 880.00 150.00 1,200.00 180.00 1,440.00 417. COLD PLANING BITUMINOUS SURFACES SY 60,900. 1.55 94,395.00 1.60 97,440.00 2.50 152,250.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 134. 12.00 1,608.00 12.50 1,675.00 19.00 2,546.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 61. 12.00 732.00 12.50 762.50 35.00 2,135.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 105. 12.00 1,260.00 12.50 1,312.50 20.00 2,100.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 13. 400.00 5,200.00 300.00 3,900.00 350.00 4,550.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 24. 500.00 12,000.00 700.00 16,800.00 450.00 10,800.00 520.01 CONCRETE CLASS AA CY 5. 1,000.00 5,000.00 550.00 2,750.00 400.00 2,000.00 520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY 6. 1,000.00 6,000.00 1,100.00 6,600.00 1,100.00 6,600.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 14. 100.00 1,400.00 100.00 1,400.00 200.00 2,800.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 317. 36.00 11,412.00 38.50 12,204.50 36.00 11,412.00 550.101 STRUCTURAL STEEL (F) LB 2,015. 5.50 11,082.50 5.50 11,082.50 5.50 11,082.50 570.4 MORTAR RUBBLE MASONRY (F) CY 2. 450.00 900.00 600.00 1,200.00 550.00 1,100.00 585.1 STONE FILL, CLASS A CY 440. 30.00 13,200.00 20.00 8,800.00 55.00 24,200.00 585.2 STONE FILL, CLASS B CY 11. 45.00 495.00 35.00 385.00 150.00 1,650.00 593.411 GEOTEXTILE; PERM. CONTROL CL. 1, NON-WOVEN SY 1,600. 1.00 1,600.00 3.00 4,800.00 2.00 3,200.00 603.0001 VIDEO INSPECTION LF 380. 4.00 1,520.00 4.00 1,520.00 3.50 1,330.00 15867 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.00218 18" R.C. PIPE, 2000D LF 80. 65.00 5,200.00 60.00 4,800.00 60.00 4,800.00 604.0007 POLYETHYLENE LINER EA 1. 150.00 150.00 125.00 125.00 250.00 250.00 604.12 CATCH BASINS TYPE B U 2. 2,100.00 4,200.00 2,500.00 5,000.00 2,700.00 5,400.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 250.00 500.00 400.00 800.00 350.00 700.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 300. 26.00 7,800.00 50.00 15,000.00 27.00 8,100.00 606.0001 STEEL BEAM FOR BEAM GUARDRAIL LF 97. 6.00 582.00 6.00 582.00 6.00 582.00 606.0031 STEEL BEAM (THRIE BEAM) FOR BEAM GUARDRAIL, INCLUDING HARDWARE LF 125. 20.00 2,500.00 20.00 2,500.00 20.00 2,500.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,350. 15.75 131,512.50 16.15 134,852.50 16.15 134,852.50 606.12008 BEAM GUARDRAIL (STANDARD SECTION - 8 FT STEEL POST) LF 2,900. 16.80 48,720.00 18.00 52,200.00 18.00 52,200.00 606.12039 MODIFIED THRIE-BEAM GUARDRAIL(DOUBLE NESTED) LF 100. 50.00 5,000.00 52.50 5,250.00 52.50 5,250.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 18. 1,750.00 31,500.00 1,850.00 33,300.00 1,850.00 33,300.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 9. 1,550.00 13,950.00 1,650.00 14,850.00 1,650.00 14,850.00 606.127 BEAM GUARDRAIL (TERM. UNI TYPE G-2) (STEEL POST) U 2. 450.00 900.00 500.00 1,000.00 500.00 1,000.00 606.1285 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 6. 2,450.00 14,700.00 2,560.00 15,360.00 2,560.00 15,360.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 350. 15.00 5,250.00 16.00 5,600.00 16.00 5,600.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 17.00 637.50 18.00 675.00 18.00 675.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 1,875.00 3,750.00 1,875.00 3,750.00 1,900.00 3,800.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 500.00 500.00 500.00 500.00 500.00 500.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 600. 15.00 9,000.00 20.00 12,000.00 22.00 13,200.00 606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 1. 1,100.00 1,100.00 1,100.00 1,100.00 1,100.00 1,100.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 4. 1,500.00 6,000.00 3,500.00 14,000.00 5,000.00 20,000.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 50. 4.00 200.00 6.00 300.00 15.00 750.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 18. 115.00 2,070.00 115.00 2,070.00 115.00 2,070.00 615.03 TRAFFIC SIGN TYPE C (F) SF 394. 36.00 14,184.00 36.00 14,184.00 36.00 14,184.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 70. 15.00 1,050.00 15.00 1,050.00 15.00 1,050.00 15867 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 618.7 FLAGGERS HR 5,000. 18.00 90,000.00 25.00 125,000.00 24.00 120,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 90,000.00 90,000.00 30,000.00 30,000.00 50,000.00 50,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 5,000.00 10,000.00 7,000.00 14,000.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 3,000.00 12,000.00 5,000.00 20,000.00 10,000.00 40,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 150. 3.00 450.00 3.00 450.00 3.00 450.00 621.31 SINGLE DELINEATOR WITH POST EA 340. 35.00 11,900.00 35.00 11,900.00 45.00 15,300.00 622.1 STEEL WITNESS MARKERS EA 2. 25.00 50.00 25.00 50.00 25.00 50.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,600. .60 960.00 1.50 2,400.00 1.30 2,080.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 211. 10.00 2,110.00 3.00 633.00 2.50 527.50 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 156,000. .10 15,600.00 .10 15,600.00 .10 15,600.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 230. 2.10 483.00 2.00 460.00 2.00 460.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 60. 2.25 135.00 2.00 120.00 2.00 120.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 250. 2.10 525.00 2.00 500.00 2.00 500.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 25. 4.25 106.25 4.00 100.00 4.00 100.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 8,500. .38 3,230.00 .40 3,400.00 .40 3,400.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 223. .98 218.54 1.00 223.00 1.00 223.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 60. .98 58.80 1.00 60.00 1.00 60.00 641. LOAM CY 65. 48.00 3,120.00 25.00 1,625.00 40.00 2,600.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 710. 2.13 1,512.30 2.00 1,420.00 2.25 1,597.50 645.531 SILT FENCE LF 12,400. 1.00 12,400.00 3.00 37,200.00 1.55 19,220.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,000.00 2,000.00 2,800.00 2,800.00 3,000.00 3,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 200. 65.00 13,000.00 70.00 14,000.00 70.00 14,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3. 1,875.00 5,625.00 1,875.00 5,625.00 2,000.00 6,000.00 647.1 HUMUS CY 1,100. 28.00 30,800.00 22.00 24,200.00 32.00 35,200.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 2,500.00 2,500.00 10,000.00 10,000.00 15,000.00 15,000.00 15867 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 150.00 150.00 200.00 200.00 250.00 250.00 670.104 TEMPORARY PORTABLE LIGHTING U 4. 700.00 2,800.00 3,500.00 14,000.00 5,500.00 22,000.00 692. MOBILIZATION U 1. 90,000.00 90,000.00 50,000.00 50,000.00 170,000.00 170,000.00 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 850.00 850.00 1,000.00 1,000.00 800.00 800.00 697.41 CRITICAL PATH METHOD (CPM)ELECTRONIC SCHEDULE U 1. 2,750.00 2,750.00 5,000.00 5,000.00 10,000.00 10,000.00 698.12 FIELD OFFICE TYPE B MON 13. 950.00 12,350.00 2,000.00 26,000.00 1,500.00 19,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 71,000.00 71,000.00 71,000.00 71,000.00 71,000.00 71,000.00 $2,972,302.43 $3,033,899.41 $3,538,805.17 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: WESTMORELAND X-A001(005), 15867 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: APRIL 18, 2013 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 12 IN WESTMORELAND COMPLETION DATE: JUNE 27, 2014 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,972,302.43 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 3,033,899.41 C THE LANE CONSTRUCTION CORPORATION 90 FIELDSTONE COURT, CHESHIRE, CT 06410 $ 3,538,805.17 D FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 3,546,761.51 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.881 INVASIVE SPECIES CONTROL TYPE I SY 600. 17.00 10,200.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 35. 100.00 3,500.00 202.31 FILL ABANDONED PIPE CY 30. 200.00 6,000.00 202.341 REMOVAL AND HANDLING/ SEGREGATING SOLID WASTE (<1% ASBESTOS) CY 4. 1,250.00 5,000.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 5. 30.00 150.00 202.7 REMOVAL OF GUARDRAIL LF 8,500. 1.50 12,750.00 203.1 COMMON EXCAVATION CY 960. 17.00 16,320.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 15. 1,800.00 27,000.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 5. 1,400.00 7,000.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 4. 1,700.00 6,800.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 5. 1,500.00 7,500.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,300. 16.00 20,800.00 203.92 ROCK SCALING MACHINE METHOD HR 20. 300.00 6,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 35.00 700.00 211.11 VIBRATION MONITORING SERVICES HR 50. 130.00 6,500.00 214. FINE GRADING U 1. 25,000.00 25,000.00 15867 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 140. 23.00 3,220.00 306.212 RECLAIMED STABILIZED BASE REMOVED AND REHANDLED 12 IN DEEP (F) SY 58,100. 1.00 58,100.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 5,900. 20.62 121,658.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 20,300. 73.45 1,491,035.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 265. 155.00 41,075.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 20,300. .85 17,255.00 403.6 PAVEMENT JOINT ADHESIVE LF 183,317. .23 42,162.91 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 19. 125.00 2,375.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 77. 69.00 5,313.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 8. 230.00 1,840.00 417. COLD PLANING BITUMINOUS SURFACES SY 60,900. 1.55 94,395.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 134. 60.00 8,040.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 61. 50.00 3,050.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 105. 50.00 5,250.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 13. 500.00 6,500.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 24. 550.00 13,200.00 520.01 CONCRETE CLASS AA CY 5. 1,250.00 6,250.00 520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY 6. 1,250.00 7,500.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 14. 100.00 1,400.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 317. 37.00 11,729.00 550.101 STRUCTURAL STEEL (F) LB 2,015. 4.00 8,060.00 570.4 MORTAR RUBBLE MASONRY (F) CY 2. 700.00 1,400.00 585.1 STONE FILL, CLASS A CY 440. 50.00 22,000.00 585.2 STONE FILL, CLASS B CY 11. 46.00 506.00 593.411 GEOTEXTILE; PERM. CONTROL CL. 1, NON-WOVEN SY 1,600. 3.00 4,800.00 603.0001 VIDEO INSPECTION LF 380. 4.00 1,520.00 15867 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 603.00218 18" R.C. PIPE, 2000D LF 80. 58.00 4,640.00 604.0007 POLYETHYLENE LINER EA 1. 275.00 275.00 604.12 CATCH BASINS TYPE B U 2. 3,500.00 7,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 750.00 1,500.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 300. 47.00 14,100.00 606.0001 STEEL BEAM FOR BEAM GUARDRAIL LF 97. 7.40 717.80 606.0031 STEEL BEAM (THRIE BEAM) FOR BEAM GUARDRAIL, INCLUDING HARDWARE LF 125. 16.00 2,000.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,350. 17.50 146,125.00 606.12008 BEAM GUARDRAIL (STANDARD SECTION - 8 FT STEEL POST) LF 2,900. 19.00 55,100.00 606.12039 MODIFIED THRIE-BEAM GUARDRAIL(DOUBLE NESTED) LF 100. 75.00 7,500.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 18. 2,000.00 36,000.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 9. 1,600.00 14,400.00 606.127 BEAM GUARDRAIL (TERM. UNI TYPE G-2) (STEEL POST) U 2. 510.00 1,020.00 606.1285 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 6. 2,750.00 16,500.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 350. 18.10 6,335.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 25.00 937.50 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 2,200.00 4,400.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 500.00 500.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 600. 32.00 19,200.00 606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 1. 1,275.00 1,275.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 4. 1,000.00 4,000.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 50. 15.00 750.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 18. 115.00 2,070.00 615.03 TRAFFIC SIGN TYPE C (F) SF 394. 40.00 15,760.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 70. 15.00 1,050.00 15867 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 13,000.00 13,000.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 13,000.00 13,000.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 12,000.00 12,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 618.7 FLAGGERS HR 5,000. 22.00 110,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 185,000.00 185,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 11,500.00 23,000.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 5,200.00 20,800.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 150. 4.00 600.00 621.31 SINGLE DELINEATOR WITH POST EA 340. 40.00 13,600.00 622.1 STEEL WITNESS MARKERS EA 2. 30.00 60.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,600. 1.05 1,680.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 211. 10.00 2,110.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 156,000. .12 18,720.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 230. 2.00 460.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 60. 2.00 120.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 250. 2.00 500.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 25. 4.00 100.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 8,500. .55 4,675.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 223. 2.60 579.80 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 60. 7.00 420.00 641. LOAM CY 65. 60.00 3,900.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 710. 2.25 1,597.50 645.531 SILT FENCE LF 12,400. 1.90 23,560.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 200. 60.00 12,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3. 5,500.00 16,500.00 647.1 HUMUS CY 1,100. 36.00 39,600.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 9,500.00 9,500.00 15867 PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 150.00 150.00 670.104 TEMPORARY PORTABLE LIGHTING U 4. 1,600.00 6,400.00 692. MOBILIZATION U 1. 215,000.00 215,000.00 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 2,500.00 2,500.00 697.41 CRITICAL PATH METHOD (CPM)ELECTRONIC SCHEDULE U 1. 500.00 500.00 698.12 FIELD OFFICE TYPE B MON 13. 2,500.00 32,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 4,620.00 4,620.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 35,000.00 35,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 71,000.00 71,000.00 $3,546,761.51 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: WESTMORELAND X-A001(005), 15867 COUNTIES AND CODES: CHESHIRE 005 DATE BIDS OPEN: APRIL 18, 2013 SCOPE OF WORK: PAVEMENT REHABILITATION LOCATION: NH ROUTE 12 IN WESTMORELAND COMPLETION DATE: JUNE 27, 2014 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK RD., BELMONT, NH 03220 $ 2,972,302.43 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 3,033,899.41 C THE LANE CONSTRUCTION CORPORATION 90 FIELDSTONE COURT, CHESHIRE, CT 06410 $ 3,538,805.17 D FRANK W. WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 3,546,761.51 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.881 INVASIVE SPECIES CONTROL TYPE I SY 600. 1.50 900.00 1.00 600.00 300.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 35. 2.00 70.00 1.25 43.75 26.25 202.31 FILL ABANDONED PIPE CY 30. 135.00 4,050.00 150.00 4,500.00 -450.00 202.341 REMOVAL AND HANDLING/ SEGREGATING SOLID WASTE (<1% ASBESTOS) CY 4. 1,250.00 5,000.00 300.00 1,200.00 3,800.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 5. 32.00 160.00 12.00 60.00 100.00 202.7 REMOVAL OF GUARDRAIL LF 8,500. .50 4,250.00 1.40 11,900.00 -7,650.00 203.1 COMMON EXCAVATION CY 960. 15.00 14,400.00 10.00 9,600.00 4,800.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 15. 700.00 10,500.00 1,000.00 15,000.00 -4,500.00 203.55541 GUARDRAIL 50' EAGRT PLATFORM ALTERNATE U 5. 700.00 3,500.00 1,000.00 5,000.00 -1,500.00 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 4. 600.00 2,400.00 950.00 3,800.00 -1,400.00 203.55551 GUARDRAIL 25' EAGRT PLATFORM ALTERNATE U 5. 600.00 3,000.00 750.00 3,750.00 -750.00 203.6 EMBANKMENT-IN-PLACE (F) CY 1,300. 6.00 7,800.00 5.00 6,500.00 1,300.00 203.92 ROCK SCALING MACHINE METHOD HR 20. 500.00 10,000.00 300.00 6,000.00 4,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 100.00 2,000.00 40.00 800.00 1,200.00 211.11 VIBRATION MONITORING SERVICES HR 50. 120.00 6,000.00 80.00 4,000.00 2,000.00 15867 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 214. FINE GRADING U 1. 50,000.00 50,000.00 60,000.00 60,000.00 -10,000.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 140. 35.00 4,900.00 20.00 2,800.00 2,100.00 306.212 RECLAIMED STABILIZED BASE REMOVED AND REHANDLED 12 IN DEEP (F) SY 58,100. .90 52,290.00 2.00 116,200.00 -63,910.00 306.36 STONE FOR RECLAIMED STABILIZED BASE TON 5,900. 25.00 147,500.00 14.00 82,600.00 64,900.00 403.11001 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 1) TON 20,300. 67.00 1,360,100.00 70.00 1,421,000.00 -60,900.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 265. 110.00 29,150.00 120.00 31,800.00 -2,650.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 20,300. 1.30 26,390.00 1.30 26,390.00 403.6 PAVEMENT JOINT ADHESIVE LF 183,317. .12 21,998.04 .30 54,995.10 -32,997.06 403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE (F) TON 19. 250.00 4,750.00 150.00 2,850.00 1,900.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 77. 250.00 19,250.00 75.00 5,775.00 13,475.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 8. 110.00 880.00 120.00 960.00 -80.00 417. COLD PLANING BITUMINOUS SURFACES SY 60,900. 1.55 94,395.00 1.50 91,350.00 3,045.00 511.0001 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 134. 12.00 1,608.00 15.00 2,010.00 -402.00 511.0002 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 61. 12.00 732.00 15.00 915.00 -183.00 511.0003 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 105. 12.00 1,260.00 15.00 1,575.00 -315.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 13. 400.00 5,200.00 300.00 3,900.00 1,300.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 24. 500.00 12,000.00 550.00 13,200.00 -1,200.00 520.01 CONCRETE CLASS AA CY 5. 1,000.00 5,000.00 850.00 4,250.00 750.00 520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY 6. 1,000.00 6,000.00 1,000.00 6,000.00 534.3 WATER REPELLENT (SILANE/ SILOXANE) GAL 14. 100.00 1,400.00 80.00 1,120.00 280.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 317. 36.00 11,412.00 25.00 7,925.00 3,487.00 550.101 STRUCTURAL STEEL (F) LB 2,015. 5.50 11,082.50 7.00 14,105.00 -3,022.50 570.4 MORTAR RUBBLE MASONRY (F) CY 2. 450.00 900.00 500.00 1,000.00 -100.00 585.1 STONE FILL, CLASS A CY 440. 30.00 13,200.00 50.00 22,000.00 -8,800.00 585.2 STONE FILL, CLASS B CY 11. 45.00 495.00 30.00 330.00 165.00 593.411 GEOTEXTILE; PERM. CONTROL CL. 1, NON-WOVEN SY 1,600. 1.00 1,600.00 3.00 4,800.00 -3,200.00 603.0001 VIDEO INSPECTION LF 380. 4.00 1,520.00 1.00 380.00 1,140.00 603.00218 18" R.C. PIPE, 2000D LF 80. 65.00 5,200.00 50.00 4,000.00 1,200.00 15867 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 604.0007 POLYETHYLENE LINER EA 1. 150.00 150.00 250.00 250.00 -100.00 604.12 CATCH BASINS TYPE B U 2. 2,100.00 4,200.00 2,150.00 4,300.00 -100.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 2. 250.00 500.00 310.00 620.00 -120.00 605.515 15" PERF. CORR. POLYETHLY PIPE UND. LF 300. 26.00 7,800.00 50.00 15,000.00 -7,200.00 606.0001 STEEL BEAM FOR BEAM GUARDRAIL LF 97. 6.00 582.00 10.00 970.00 -388.00 606.0031 STEEL BEAM (THRIE BEAM) FOR BEAM GUARDRAIL, INCLUDING HARDWARE LF 125. 20.00 2,500.00 20.00 2,500.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 8,350. 15.75 131,512.50 16.25 135,687.50 -4,175.00 606.12008 BEAM GUARDRAIL (STANDARD SECTION - 8 FT STEEL POST) LF 2,900. 16.80 48,720.00 16.50 47,850.00 870.00 606.12039 MODIFIED THRIE-BEAM GUARDRAIL(DOUBLE NESTED) LF 100. 50.00 5,000.00 30.00 3,000.00 2,000.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 18. 1,750.00 31,500.00 1,950.00 35,100.00 -3,600.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 9. 1,550.00 13,950.00 1,700.00 15,300.00 -1,350.00 606.127 BEAM GUARDRAIL (TERM. UNI TYPE G-2) (STEEL POST) U 2. 450.00 900.00 500.00 1,000.00 -100.00 606.1285 BEAM GUARDRAIL (BRIDGE APPROACH UNIT) U 6. 2,450.00 14,700.00 2,500.00 15,000.00 -300.00 606.140 BEAM GUARDRAIL (STANDARD SECTION- WOOD POSTS) LF 350. 15.00 5,250.00 17.50 6,125.00 -875.00 606.141 BEAM GUARDRAIL (CURVED W/CRT POSTS) LF 37.5 17.00 637.50 25.00 937.50 -300.00 606.1454 BEAM GUARDRAIL (TERM. UNIT TYPE EAGRT 50 FT.) U 2. 1,875.00 3,750.00 2,000.00 4,000.00 -250.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 1. 500.00 500.00 500.00 500.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 600. 15.00 9,000.00 25.00 15,000.00 -6,000.00 606.84 ANCHOR FOR CURVED GUARDRAIL W/CRT POSTS U 1. 1,100.00 1,100.00 1,250.00 1,250.00 -150.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 4. 1,500.00 6,000.00 5,000.00 20,000.00 -14,000.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 50. 4.00 200.00 5.00 250.00 -50.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 18. 115.00 2,070.00 100.00 1,800.00 270.00 615.03 TRAFFIC SIGN TYPE C (F) SF 394. 36.00 14,184.00 45.00 17,730.00 -3,546.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 70. 15.00 1,050.00 12.00 840.00 210.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 11,500.00 11,500.00 8,500.00 8,500.00 3,000.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 11,500.00 11,500.00 12,000.00 12,000.00 -500.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 10,000.00 10,000.00 11,000.00 11,000.00 -1,000.00 15867 PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 618.7 FLAGGERS HR 5,000. 18.00 90,000.00 21.00 105,000.00 -15,000.00 619.1 MAINTENANCE OF TRAFFIC U 1. 90,000.00 90,000.00 60,000.00 60,000.00 30,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 3,000.00 6,000.00 6,000.00 12,000.00 -6,000.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 3,000.00 12,000.00 8,000.00 32,000.00 -20,000.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 150. 3.00 450.00 5.00 750.00 -300.00 621.31 SINGLE DELINEATOR WITH POST EA 340. 35.00 11,900.00 30.00 10,200.00 1,700.00 622.1 STEEL WITNESS MARKERS EA 2. 25.00 50.00 30.00 60.00 -10.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,600. .60 960.00 1.40 2,240.00 -1,280.00 628.22 SAWED BITUMINOUS PAVEMENT (BRIDGE) LF 211. 10.00 2,110.00 5.00 1,055.00 1,055.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 156,000. .10 15,600.00 .10 15,600.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 230. 2.10 483.00 3.00 690.00 -207.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 60. 2.25 135.00 2.00 120.00 15.00 632.3108 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 8" LINE LF 250. 2.10 525.00 1.10 275.00 250.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 25. 4.25 106.25 6.00 150.00 -43.75 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 8,500. .38 3,230.00 .30 2,550.00 680.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 223. .98 218.54 1.25 278.75 -60.21 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 60. .98 58.80 1.00 60.00 -1.20 641. LOAM CY 65. 48.00 3,120.00 27.00 1,755.00 1,365.00 645.43 TEMPORARY SLOPE STABILIZATION TYPE C SY 710. 2.13 1,512.30 1.50 1,065.00 447.30 645.531 SILT FENCE LF 12,400. 1.00 12,400.00 2.00 24,800.00 -12,400.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,000.00 2,000.00 2,300.00 2,300.00 -300.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 200. 65.00 13,000.00 50.00 10,000.00 3,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3. 1,875.00 5,625.00 1,750.00 5,250.00 375.00 647.1 HUMUS CY 1,100. 28.00 30,800.00 18.00 19,800.00 11,000.00 670.0461 CONSTRUCT AND REMOVE TEMPORARY WIDENING U 1. 2,500.00 2,500.00 2,000.00 2,000.00 500.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 1. 150.00 150.00 200.00 200.00 -50.00 670.104 TEMPORARY PORTABLE LIGHTING U 4. 700.00 2,800.00 6,000.00 24,000.00 -21,200.00 692. MOBILIZATION U 1. 90,000.00 90,000.00 120,000.00 120,000.00 -30,000.00 15867 PAGE 5 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 850.00 850.00 1,800.00 1,800.00 -950.00 697.41 CRITICAL PATH METHOD (CPM)ELECTRONIC SCHEDULE U 1. 2,750.00 2,750.00 4,000.00 4,000.00 -1,250.00 698.12 FIELD OFFICE TYPE B MON 13. 950.00 12,350.00 1,750.00 22,750.00 -10,400.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 4,620.00 4,620.00 4,620.00 4,620.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 35,000.00 35,000.00 35,000.00 35,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 50,000.00 50,000.00 50,000.00 50,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 71,000.00 71,000.00 71,000.00 71,000.00 $2,972,302.43 $3,171,862.60 -199,560.17