THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: RESURFACING DISTRICT II, 16162B COUNTIES AND CODES: GRAFTON 009 SULLIVAN 019 DATE BIDS OPEN: FEBRUARY 28, 2013 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 20, 2013 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,578,298.00 B FRANK W WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 1,681,330.00 C CONTINENTAL PAVING INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,734,225.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 2,000. 67.50 135,000.00 75.75 151,500.00 74.50 149,000.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 1,300. 68.25 88,725.00 83.00 107,900.00 85.00 110,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 95.00 4,750.00 105.00 5,250.00 110.00 5,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 37,100. .23 8,533.00 .28 10,388.00 .25 9,275.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 15,800. 70.85 1,119,430.00 74.22 1,172,676.00 77.75 1,228,450.00 417. COLD PLANING BITUMINOUS SURFACES SY 21,200. 1.80 38,160.00 2.68 56,816.00 3.00 63,600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 900. 18.50 16,650.00 17.00 15,300.00 23.00 20,700.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 200.00 1,200.00 300.00 1,800.00 200.00 1,200.00 624.1 RAILROAD PROTECTION - FLAGGING SERVICE HR 10. 85.00 850.00 70.00 700.00 100.00 1,000.00 692. MOBILIZATION U 1. 45,000.00 45,000.00 39,000.00 39,000.00 25,000.00 25,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 $1,578,298.00 $1,681,330.00 $1,734,225.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: RESURFACING DISTRICT II, 16162B COUNTIES AND CODES: GRAFTON 009 SULLIVAN 019 DATE BIDS OPEN: FEBRUARY 28, 2013 SCOPE OF WORK: ROADWAY RESURFACING LOCATION: SEE THE PROSECUTION OF WORK COMPLETION DATE: SEPTEMBER 20, 2013 A PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 1,578,298.00 B FRANK W WHITCOMB CONSTRUCTION CORPORATION 187 WHITCOMB ROAD, PO BOX 1000, WALPOLE, NH 03608 $ 1,681,330.00 C CONTINENTAL PAVING INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 1,734,225.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 2,000. 67.50 135,000.00 65.00 130,000.00 5,000.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 1,300. 68.25 88,725.00 77.00 100,100.00 -11,375.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 50. 95.00 4,750.00 125.00 6,250.00 -1,500.00 403.6 PAVEMENT JOINT ADHESIVE LF 37,100. .23 8,533.00 .25 9,275.00 -742.00 411.3 PLANT MIX SURFACE TREAT- MENT (AC), PAVER SHIM TON 15,800. 70.85 1,119,430.00 71.00 1,121,800.00 -2,370.00 417. COLD PLANING BITUMINOUS SURFACES SY 21,200. 1.80 38,160.00 3.50 74,200.00 -36,040.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 618.7 FLAGGERS HR 900. 18.50 16,650.00 22.00 19,800.00 -3,150.00 619.253 PORTABLE CHANGEABLE MESSAGE SIGN (UNIT WEEK) UWK 6. 200.00 1,200.00 350.00 2,100.00 -900.00 624.1 RAILROAD PROTECTION - FLAGGING SERVICE HR 10. 85.00 850.00 150.00 1,500.00 -650.00 692. MOBILIZATION U 1. 45,000.00 45,000.00 75,000.00 75,000.00 -30,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1008.11 ALTERATIONS AND ADDITIONS AS NEEDED - UNANTICIPATED WORK $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 $1,578,298.00 $1,660,025.00 -81,727.00