THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: PORTSMOUTH X-A000(994), 13455A COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: OCTOBER 10, 2012 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: US ROUTE 1 BYPASS AND US ROUTE 1 INTERSECTION IN PORTSMOUTH COMPLETION DATE: AUGUST 22, 2014 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 4,317,581.60 B SEVERINO TRUCKING CO., INC. PO BOX 202, CANDIA, NH 03034 $ 4,320,889.40 C NORTHEAST EARTH MECHANICS 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 5,489,986.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A 1.6 8,500.00 13,600.00 10,000.00 16,000.00 6,700.00 10,720.00 201.21 REMOVING SMALL TREES EA 6. 150.00 900.00 100.00 600.00 100.00 600.00 201.4 REMOVING STUMPS EA 1. 200.00 200.00 250.00 250.00 100.00 100.00 201.881 INVASIVE SPECIES CONTROL TYPE I SY 3,800. 2.00 7,600.00 1.00 3,800.00 1.00 3,800.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 1,000. 2.00 2,000.00 2.00 2,000.00 1.00 1,000.00 202.201 DEMOLISHING BUILDINGS U 1. 16,000.00 16,000.00 15,000.00 15,000.00 29,000.00 29,000.00 202.31 FILL ABANDONED PIPE CY 15. 150.00 2,250.00 300.00 4,500.00 200.00 3,000.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 1,300. 8.00 10,400.00 10.00 13,000.00 26.00 33,800.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 12. 250.00 3,000.00 350.00 4,200.00 1,350.00 16,200.00 202.7 REMOVAL OF GUARDRAIL LF 2,300. 2.00 4,600.00 2.50 5,750.00 2.50 5,750.00 202.871 REMOVE AND SALVAGE BUS SHELTER U 2. 1,000.00 2,000.00 600.00 1,200.00 1,200.00 2,400.00 203.1 COMMON EXCAVATION CY 27,800. 9.75 271,050.00 7.50 208,500.00 12.00 333,600.00 203.2 ROCK EXCAVATION CY 6,750. 29.00 195,750.00 25.00 168,750.00 40.00 270,000.00 203.35 HANDLING CONTAMINATED SOILS (DEPARTMENT DISPOSAL) CY 340. 20.00 6,800.00 30.00 10,200.00 50.00 17,000.00 203.36 HANDLING/SEGERATING EXCAVATED SOLID WASTE CY 50. 20.00 1,000.00 40.00 2,000.00 20.00 1,000.00 203.53 LOW PERMEABILITY FILL (F) CY 256. 8.80 2,252.80 12.50 3,200.00 30.00 7,680.00 203.55262 INSTALLATION AND REMOVAL OF SWZ - PORTABLE CHANGEABLE MESSAGE SIGN U 2. 700.00 1,400.00 1,500.00 3,000.00 1,100.00 2,200.00 13455A PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 2. 800.00 1,600.00 800.00 1,600.00 1,000.00 2,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 4,154. 6.25 25,962.50 4.00 16,616.00 12.00 49,848.00 206.1 COMMON STRUCTURE EXCAVATION CY 1,300. 15.30 19,890.00 18.00 23,400.00 20.00 26,000.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 55.00 2,750.00 75.00 3,750.00 50.00 2,500.00 206.2 ROCK STRUCTURE EXCAVATION CY 1,500. 67.50 101,250.00 45.00 67,500.00 90.00 135,000.00 209.1 GRANULAR BACKFILL CY 710. 28.00 19,880.00 25.00 17,750.00 25.00 17,750.00 211.11 VIBRATION MONITORING SERVICES HR 50. 77.00 3,850.00 75.00 3,750.00 125.00 6,250.00 214. FINE GRADING U 1. 30,000.00 30,000.00 50,000.00 50,000.00 15,000.00 15,000.00 304.1 SAND (F) CY 8,068. 17.50 141,190.00 15.00 121,020.00 20.00 161,360.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 440. 24.65 10,846.00 25.00 11,000.00 35.00 15,400.00 304.399 TEMPORARY CRUSHED GRAVEL CY 190. 21.50 4,085.00 25.00 4,750.00 35.00 6,650.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 5,403. 22.00 118,866.00 20.00 108,060.00 40.00 216,120.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 4,117. 22.00 90,574.00 20.00 82,340.00 40.00 164,680.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 5,300. 69.80 369,940.00 70.00 371,000.00 70.00 371,000.00 403.11902 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH (QC/QA TIER 2) TON 2,100. 81.00 170,100.00 88.00 184,800.00 85.00 178,500.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 490. 112.25 55,002.50 125.00 61,250.00 115.00 56,350.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 7,300. 1.00 7,300.00 1.00 7,300.00 1.00 7,300.00 403.6 PAVEMENT JOINT ADHESIVE LF 47,700. .27 12,879.00 .22 10,494.00 .25 11,925.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 200. 90.00 18,000.00 100.00 20,000.00 95.00 19,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 5,600. 2.80 15,680.00 3.50 19,600.00 5.00 28,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 65,000.00 65,000.00 75,000.00 75,000.00 23,000.00 23,000.00 503.101 WATER DIVERSION STRUCTURE U 1. 4,500.00 4,500.00 5,000.00 5,000.00 20,000.00 20,000.00 503.201 COFFERDAMS U 1. 31,000.00 31,000.00 44,000.00 44,000.00 33,000.00 33,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 15,500.00 15,500.00 8,500.00 8,500.00 16,000.00 16,000.00 508. STRUCTURAL FILL CY 460. 35.75 16,445.00 30.00 13,800.00 30.00 13,800.00 520.1 CONCRETE CLASS A CY 9. 375.00 3,375.00 500.00 4,500.00 115.00 1,035.00 520.2 CONCRETE CLASS B CY 95. 285.00 27,075.00 270.00 25,650.00 290.00 27,550.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 73. 150.00 10,950.00 200.00 14,600.00 110.00 8,030.00 544.1 REINFORCING STEEL (ROADWAY) LB 7,700. .95 7,315.00 1.20 9,240.00 1.50 11,550.00 570.4 MORTAR RUBBLE MASONRY (F) CY 7. 500.00 3,500.00 800.00 5,600.00 500.00 3,500.00 585.2 STONE FILL, CLASS B CY 62. 18.00 1,116.00 35.00 2,170.00 40.00 2,480.00 13455A PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 585.3 STONE FILL, CLASS C CY 140. 34.50 4,830.00 37.50 5,250.00 40.00 5,600.00 585.5 STONE FILL, CLASS E CY 380. 31.00 11,780.00 40.00 15,200.00 40.00 15,200.00 585.7 STONE FILL, CLASS G CY 62. 34.25 2,123.50 45.00 2,790.00 42.00 2,604.00 593.321 GEOTEXTILE; STABILIZATION CL.2, NON-WOVEN SY 2,900. 2.00 5,800.00 2.00 5,800.00 1.20 3,480.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 610. 2.00 1,220.00 2.00 1,220.00 2.00 1,220.00 603.0001 VIDEO INSPECTION LF 4,600. .70 3,220.00 1.00 4,600.00 2.00 9,200.00 603.00212 12" R.C. PIPE, 2000D LF 150. 46.75 7,012.50 35.00 5,250.00 75.00 11,250.00 603.00215 15" R.C. PIPE, 2000D LF 810. 53.20 43,092.00 36.00 29,160.00 80.00 64,800.00 603.00218 18" R.C. PIPE, 2000D LF 850. 55.45 47,132.50 38.00 32,300.00 83.00 70,550.00 603.00224 24" R.C. PIPE, 2000D LF 850. 68.25 58,012.50 48.00 40,800.00 90.00 76,500.00 603.00312 12" R.C. PIPE, 3000D LF 180. 46.75 8,415.00 38.00 6,840.00 75.00 13,500.00 603.00315 15" R.C. PIPE, 3000D LF 300. 53.55 16,065.00 40.00 12,000.00 80.00 24,000.00 603.00318 18" R.C. PIPE, 3000D LF 220. 62.55 13,761.00 46.00 10,120.00 85.00 18,700.00 603.00324 24" R.C. PIPE, 3000D LF 520. 71.50 37,180.00 50.00 26,000.00 96.00 49,920.00 603.00330 30" R.C. PIPE, 3000D LF 570. 98.00 55,860.00 90.00 51,300.00 115.00 65,550.00 603.30112 12" R.C. END SECTIONS EA 1. 540.00 540.00 700.00 700.00 385.00 385.00 603.30115 15" R.C. END SECTIONS EA 1. 580.00 580.00 725.00 725.00 425.00 425.00 603.30124 24" R.C. END SECTIONS EA 1. 725.00 725.00 850.00 850.00 600.00 600.00 603.80010 10" PLASTIC PIPE LF 8. 50.00 400.00 50.00 400.00 22.00 176.00 603.80012 12" PLASTIC PIPE LF 35. 40.00 1,400.00 40.00 1,400.00 70.00 2,450.00 603.80015 15" PLASTIC PIPE LF 77. 38.50 2,964.50 40.00 3,080.00 70.00 5,390.00 604.0007 POLYETHYLENE LINER EA 51. 170.00 8,670.00 150.00 7,650.00 125.00 6,375.00 604.12 CATCH BASINS TYPE B U 57. 1,800.00 102,600.00 2,100.00 119,700.00 3,500.00 199,500.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 4. 2,100.00 8,400.00 3,000.00 12,000.00 4,800.00 19,200.00 604.1252 CATCH BASIN, TYPE B, 5' DIAM. DOUBLE GRATES U 1. 2,700.00 2,700.00 3,500.00 3,500.00 5,700.00 5,700.00 604.225 DROP INLETS TYPE B, 5-FOOT DIAMETER U 1. 1,900.00 1,900.00 3,100.00 3,100.00 5,300.00 5,300.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 2. 2,400.00 4,800.00 2,800.00 5,600.00 5,400.00 10,800.00 604.326 DRAINAGE MANHOLES, 6-FOOT DIAMETER U 1. 3,150.00 3,150.00 3,500.00 3,500.00 6,200.00 6,200.00 604.328 DRAINAGE MANHOLES, 8-FOOT DIAMETER U 3. 7,085.00 21,255.00 8,000.00 24,000.00 7,600.00 22,800.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LF 15. 375.00 5,625.00 550.00 8,250.00 300.00 4,500.00 604.9101 OUTLET CONTROL STRUCTURE U 1. 4,850.00 4,850.00 5,000.00 5,000.00 8,500.00 8,500.00 604.921 LEACHING CHAMBER, TYPE 1 U 6. 1,700.00 10,200.00 1,500.00 9,000.00 3,000.00 18,000.00 604.922 LEACHING CHAMBER, TYPE 2 U 5. 1,850.00 9,250.00 1,550.00 7,750.00 3,000.00 15,000.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 3,000. 19.50 58,500.00 15.00 45,000.00 30.00 90,000.00 605.79 UNDERDRAIN FLUSHING BASINS EA 2. 450.00 900.00 375.00 750.00 235.00 470.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 640. 20.00 12,800.00 20.00 12,800.00 22.00 14,080.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 2. 1,650.00 3,300.00 1,700.00 3,400.00 2,250.00 4,500.00 13455A PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 2,200. 18.00 39,600.00 25.00 55,000.00 50.00 110,000.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 5. 3,500.00 17,500.00 3,500.00 17,500.00 1,300.00 6,500.00 607.360 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC, 6' HIGH LF 620. 22.08 13,689.60 22.00 13,640.00 22.00 13,640.00 607.4260 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6' HIGH EA 12. 170.00 2,040.00 170.00 2,040.00 180.00 2,160.00 607.73612 12' OPENING DOUBLE GATE CHAIN LINK VINYL COATED STEEL FABRIC, 6' HIGH U 1. 1,285.00 1,285.00 1,300.00 1,300.00 1,225.00 1,225.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 21. 15.00 315.00 36.00 756.00 33.00 693.00 608.26 6" CONCRETE SIDEWALK (F) SY 1,527. 38.00 58,026.00 44.00 67,188.00 40.00 61,080.00 608.34 4" REINFORCED CONCRETE SIDEWALK (F) SY 2,482. 36.50 90,593.00 43.00 106,726.00 39.00 96,798.00 608.36 6" REINFORCED CONCRETE SIDEWALK (F) SY 59. 39.50 2,330.50 46.00 2,714.00 50.00 2,950.00 608.52 TRUNCATED DOME PAVERS (DETECTABLE WARNING PAVERS) SY 11. 385.00 4,235.00 400.00 4,400.00 425.00 4,675.00 609.01 STRAIGHT GRANITE CURB LF 2,200. 17.00 37,400.00 16.45 36,190.00 20.00 44,000.00 609.02 CURVED GRANITE CURB LF 350. 26.25 9,187.50 27.00 9,450.00 30.00 10,500.00 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 850. 15.65 13,302.50 15.30 13,005.00 20.00 17,000.00 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 97. 15.65 1,518.05 15.30 1,484.10 20.00 1,940.00 609.5 RESET GRANITE CURB LF 6,080. 6.10 37,088.00 7.00 42,560.00 10.00 60,800.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 30. 15.00 450.00 10.00 300.00 10.00 300.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 105. 75.00 7,875.00 95.00 9,975.00 90.00 9,450.00 611.05208 8" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 105. 85.00 8,925.00 100.00 10,500.00 95.00 9,975.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 1,550. 80.00 124,000.00 75.00 116,250.00 120.00 186,000.00 611.31004 4" DUCTILE IRON GATE VALVE EA 1. 700.00 700.00 575.00 575.00 650.00 650.00 611.31006 6" DUCTICLE IRON GATE VALVE EA 4. 785.00 3,140.00 670.00 2,680.00 750.00 3,000.00 611.31008 8" DUCTICLE IRON GATE VALVE EA 2. 1,200.00 2,400.00 965.00 1,930.00 1,100.00 2,200.00 611.31012 12" DUCTICLE IRON GATE VALVE EA 3. 2,100.00 6,300.00 1,850.00 5,550.00 2,100.00 6,300.00 611.5011 1" COPPER WATER PIPE LF 40. 32.00 1,280.00 65.00 2,600.00 86.00 3,440.00 611.5012 2" COPPER WATER PIPE LF 215. 42.50 9,137.50 65.00 13,975.00 80.00 17,200.00 611.50301 1" COPPER TUBING LF 20. 32.00 640.00 65.00 1,300.00 98.00 1,960.00 13455A PAGE 5 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 611.5101 1" CORPORATION STOP EA 2. 250.00 500.00 225.00 450.00 250.00 500.00 611.5102 2" CORPORATION STOP EA 3. 350.00 1,050.00 500.00 1,500.00 400.00 1,200.00 611.5201 1" CURB STOP AND BOX EA 2. 220.00 440.00 275.00 550.00 125.00 250.00 611.5202 2" CURB STOP AND BOX EA 3. 400.00 1,200.00 400.00 1,200.00 340.00 1,020.00 611.70004 4" DUCTILE IRON WATER MAIN FITTINGS EA 1. 515.00 515.00 1,100.00 1,100.00 90.00 90.00 611.70006 6" FITTING EA 4. 400.00 1,600.00 400.00 1,600.00 260.00 1,040.00 611.70008 8" FITTING EA 8. 625.00 5,000.00 350.00 2,800.00 300.00 2,400.00 611.70012 12" FITTING EA 18. 900.00 16,200.00 675.00 12,150.00 700.00 12,600.00 611.81 HYDRANTS EA 1. 3,500.00 3,500.00 4,250.00 4,250.00 4,600.00 4,600.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 200.00 3,000.00 125.00 1,875.00 150.00 2,250.00 611.951 WATER MAIN INSULATION SY 10. 20.00 200.00 20.00 200.00 15.00 150.00 612.33036 36" SPLIT SLEEVE STEEL CASING PIPE LF 16. 1,060.00 16,960.00 525.00 8,400.00 650.00 10,400.00 612.70010 10" PVC SEWER FITTING EA 2. 885.00 1,770.00 555.00 1,110.00 45.00 90.00 614.511 CONCRETE PULL BOX 14" EA 22. 295.80 6,507.60 290.00 6,380.00 320.00 7,040.00 614.523 MOLDED PULL BOX 17"X30" EA 3. 341.25 1,023.75 325.00 975.00 375.00 1,125.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 2,000. 6.30 12,600.00 6.00 12,000.00 7.00 14,000.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 660. 10.20 6,732.00 10.00 6,600.00 12.00 7,920.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 30. 100.00 3,000.00 134.00 4,020.00 150.00 4,500.00 615.03 TRAFFIC SIGN TYPE C (F) SF 272. 36.00 9,792.00 30.00 8,160.00 32.00 8,704.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2. 250.00 500.00 150.00 300.00 200.00 400.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 542. 17.00 9,214.00 18.00 9,756.00 20.00 10,840.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 14. 12.00 168.00 18.00 252.00 12.00 168.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 69. 10.00 690.00 12.00 828.00 12.00 828.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 38,850.00 38,850.00 35,000.00 35,000.00 38,000.00 38,000.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 38,850.00 38,850.00 36,500.00 36,500.00 40,000.00 40,000.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 4,250.00 4,250.00 6,000.00 6,000.00 6,500.00 6,500.00 616.101 TRAFFIC SIGNALS U 1. 84,660.00 84,660.00 83,000.00 83,000.00 90,000.00 90,000.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 19,890.00 19,890.00 19,500.00 19,500.00 21,000.00 21,000.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 8,915.00 8,915.00 8,740.00 8,740.00 9,500.00 9,500.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 3,570.00 3,570.00 3,500.00 3,500.00 3,800.00 3,800.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 11,985.00 11,985.00 11,750.00 11,750.00 12,700.00 12,700.00 616.192 ALTERATIONS TO TRAFFIC SIGNALS U 1. 23,640.00 23,640.00 23,715.00 23,715.00 13,800.00 13,800.00 616.193 ALTERATIONS TO TRAFFIC SIGNALS U 1. 8,100.00 8,100.00 7,940.00 7,940.00 8,650.00 8,650.00 616.194 ALTERATIONS TO TRAFFIC SIGNALS U 1. 5,510.00 5,510.00 5,400.00 5,400.00 5,850.00 5,850.00 616.195 ALTERATIONS TO TRAFFIC SIGNALS U 1. 7,275.00 7,275.00 7,125.00 7,125.00 7,700.00 7,700.00 13455A PAGE 6 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 76,000.00 618.7 FLAGGERS HR 4,200. 21.00 88,200.00 17.50 73,500.00 24.00 100,800.00 619.1 MAINTENANCE OF TRAFFIC U 1. 70,000.00 70,000.00 75,000.00 75,000.00 47,000.00 47,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 7,200.00 21,600.00 15,000.00 45,000.00 11,200.00 33,600.00 619.501 SMART WORK ZONE DEPLOYMENT U 1. 1,725.00 1,725.00 1,650.00 1,650.00 1,800.00 1,800.00 619.502 SMART WORK ZONE OPERATIONAL COST (WINTER) MON 8. 205.00 1,640.00 195.00 1,560.00 220.00 1,760.00 619.503 SMART WORK ZONE OPERATIONAL COST (SUMMER) MON 14. 70.00 980.00 65.00 910.00 70.00 980.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 66. 400.00 26,400.00 685.00 45,210.00 800.00 52,800.00 619.91 RELOCATE SMART WORK ZONE DEVICE U 2. 300.00 600.00 285.00 570.00 300.00 600.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 11. 5.00 55.00 5.00 55.00 8.00 88.00 621.31 SINGLE DELINEATOR WITH POST EA 5. 32.00 160.00 32.00 160.00 33.00 165.00 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 51. 35.00 1,785.00 35.00 1,785.00 37.00 1,887.00 622.1 STEEL WITNESS MARKERS EA 8. 30.00 240.00 30.00 240.00 35.00 280.00 622.2 CONCRETE BOUNDS EA 17. 390.00 6,630.00 400.00 6,800.00 325.00 5,525.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,100. 1.50 1,650.00 2.00 2,200.00 2.00 2,200.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 87,300. .13 11,349.00 .12 10,476.00 .15 13,095.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 800. 1.25 1,000.00 1.25 1,000.00 1.25 1,000.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 1,303. 1.75 2,280.25 1.75 2,280.25 2.00 2,606.00 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 2,400. .45 1,080.00 .45 1,080.00 .50 1,200.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 790. .58 458.20 .58 458.20 .65 513.50 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 530. 2.45 1,298.50 2.45 1,298.50 2.75 1,457.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 844. 4.65 3,924.60 4.65 3,924.60 5.00 4,220.00 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 20,700. .35 7,245.00 .35 7,245.00 4.00 82,800.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 280. .95 266.00 .95 266.00 1.00 280.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 465. .95 441.75 .95 441.75 1.00 465.00 641. LOAM CY 2,000. 20.00 40,000.00 40.00 80,000.00 50.00 100,000.00 13455A PAGE 7 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 643.22 FERTILIZER FOR REFERTILIZATION TON 2. 785.00 1,570.00 750.00 1,500.00 800.00 1,600.00 644.62 WET BASIN/MEADOW SEED LB 14. 220.00 3,080.00 210.00 2,940.00 225.00 3,150.00 645.121 TEMPORARY MULCH WITH TACKIFIFERS SY 12,800. .20 2,560.00 .20 2,560.00 .25 3,200.00 645.3 EROSION STONE TON 1,100. 20.00 22,000.00 21.00 23,100.00 30.00 33,000.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 10,300. 1.80 18,540.00 1.50 15,450.00 2.00 20,600.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 490. 3.90 1,911.00 5.00 2,450.00 4.00 1,960.00 645.531 SILT FENCE LF 4,900. 1.50 7,350.00 3.00 14,700.00 4.00 19,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 4,465.00 4,465.00 12,500.00 12,500.00 6,800.00 6,800.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 420. 52.00 21,840.00 50.00 21,000.00 60.00 25,200.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3. 1,835.00 5,505.00 1,750.00 5,250.00 1,900.00 5,700.00 647.1 HUMUS CY 370. 14.00 5,180.00 25.00 9,250.00 7.00 2,590.00 647.29 WETLAND HUMUS CY 130. 16.00 2,080.00 30.00 3,900.00 10.00 1,300.00 650.2 LANDSCAPING U 1. 25,500.00 25,500.00 24,485.00 24,485.00 29,000.00 29,000.00 660.82 INSTALL BUS SHELTER (SUPPLIED BY OTHERS) U 3. 2,000.00 6,000.00 2,300.00 6,900.00 3,000.00 9,000.00 662.282 DECOMMISION MONITORING WELL LF 100. 5.00 500.00 15.00 1,500.00 9.00 900.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 1. 250.00 250.00 150.00 150.00 350.00 350.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 150.00 450.00 125.00 375.00 150.00 450.00 670.95 TEMPORARY SAFETY FENCE LF 320. 2.50 800.00 4.00 1,280.00 3.00 960.00 692. MOBILIZATION U 1. 220,000.00 220,000.00 270,000.00 270,000.00 300,000.00 300,000.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 600.00 600.00 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 1,300.00 1,300.00 1,250.00 1,250.00 2,700.00 2,700.00 697.21 PROJECT HEALTH AND SAFETY PLAN U 1. 1,840.00 1,840.00 1,750.00 1,750.00 2,500.00 2,500.00 697.41 CRITICAL PATH METHOD (CPM) ELECTRONIC SCHEDULE U 1. 10,000.00 10,000.00 12,200.00 12,200.00 600.00 600.00 698.12 FIELD OFFICE TYPE B MON 24. 1,700.00 40,800.00 1,200.00 28,800.00 1,500.00 36,000.00 698.2 PHYSICAL TESTING LABORATORY MON 22. 800.00 17,600.00 450.00 9,900.00 600.00 13,200.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 13455A PAGE 8 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 $4,317,581.60 $4,320,889.40 $5,489,986.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: PORTSMOUTH X-A000(994), 13455A COUNTIES AND CODES: ROCKINGHAM 015 DATE BIDS OPEN: OCTOBER 10, 2012 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: US ROUTE 1 BYPASS AND US ROUTE 1 INTERSECTION IN PORTSMOUTH COMPLETION DATE: AUGUST 22, 2014 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 4,317,581.60 B SEVERINO TRUCKING CO., INC. PO BOX 202, CANDIA, NH 03034 $ 4,320,889.40 C NORTHEAST EARTH MECHANICS 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 5,489,986.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.1 CLEARING AND GRUBBING (F) A 1.6 8,500.00 13,600.00 5,000.00 8,000.00 5,600.00 201.21 REMOVING SMALL TREES EA 6. 150.00 900.00 150.00 900.00 201.4 REMOVING STUMPS EA 1. 200.00 200.00 150.00 150.00 50.00 201.881 INVASIVE SPECIES CONTROL TYPE I SY 3,800. 2.00 7,600.00 1.00 3,800.00 3,800.00 201.882 INVASIVE SPECIES CONTROL TYPE II SY 1,000. 2.00 2,000.00 1.00 1,000.00 1,000.00 202.201 DEMOLISHING BUILDINGS U 1. 16,000.00 16,000.00 15,000.00 15,000.00 1,000.00 202.31 FILL ABANDONED PIPE CY 15. 150.00 2,250.00 200.00 3,000.00 -750.00 202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 1,300. 8.00 10,400.00 10.00 13,000.00 -2,600.00 202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA 12. 250.00 3,000.00 213.00 2,556.00 444.00 202.7 REMOVAL OF GUARDRAIL LF 2,300. 2.00 4,600.00 1.50 3,450.00 1,150.00 202.871 REMOVE AND SALVAGE BUS SHELTER U 2. 1,000.00 2,000.00 500.00 1,000.00 1,000.00 203.1 COMMON EXCAVATION CY 27,800. 9.75 271,050.00 6.00 166,800.00 104,250.00 203.2 ROCK EXCAVATION CY 6,750. 29.00 195,750.00 20.00 135,000.00 60,750.00 203.35 HANDLING CONTAMINATED SOILS (DEPARTMENT DISPOSAL) CY 340. 20.00 6,800.00 20.00 6,800.00 203.36 HANDLING/SEGERATING EXCAVATED SOLID WASTE CY 50. 20.00 1,000.00 20.00 1,000.00 203.53 LOW PERMEABILITY FILL (F) CY 256. 8.80 2,252.80 15.00 3,840.00 -1,587.20 203.55262 INSTALLATION AND REMOVAL OF SWZ - PORTABLE CHANGEABLE MESSAGE SIGN U 2. 700.00 1,400.00 2,000.00 4,000.00 -2,600.00 13455A PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 203.5555 GUARDRAIL 25' EAGRT PLATFORM U 2. 800.00 1,600.00 850.00 1,700.00 -100.00 203.6 EMBANKMENT-IN-PLACE (F) CY 4,154. 6.25 25,962.50 5.00 20,770.00 5,192.50 206.1 COMMON STRUCTURE EXCAVATION CY 1,300. 15.30 19,890.00 17.00 22,100.00 -2,210.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 50. 55.00 2,750.00 35.00 1,750.00 1,000.00 206.2 ROCK STRUCTURE EXCAVATION CY 1,500. 67.50 101,250.00 25.00 37,500.00 63,750.00 209.1 GRANULAR BACKFILL CY 710. 28.00 19,880.00 26.00 18,460.00 1,420.00 211.11 VIBRATION MONITORING SERVICES HR 50. 77.00 3,850.00 75.00 3,750.00 100.00 214. FINE GRADING U 1. 30,000.00 30,000.00 10,000.00 10,000.00 20,000.00 304.1 SAND (F) CY 8,068. 17.50 141,190.00 11.00 88,748.00 52,442.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 440. 24.65 10,846.00 30.00 13,200.00 -2,354.00 304.399 TEMPORARY CRUSHED GRAVEL CY 190. 21.50 4,085.00 30.00 5,700.00 -1,615.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 5,403. 22.00 118,866.00 20.00 108,060.00 10,806.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 4,117. 22.00 90,574.00 20.00 82,340.00 8,234.00 403.11002 HOT BITUMINOUS PAVEMENT, MACHINE METHOD (QC/QA TIER 2) TON 5,300. 69.80 369,940.00 65.00 344,500.00 25,440.00 403.11902 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH (QC/QA TIER 2) TON 2,100. 81.00 170,100.00 80.00 168,000.00 2,100.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 490. 112.25 55,002.50 110.00 53,900.00 1,102.50 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 7,300. 1.00 7,300.00 1.25 9,125.00 -1,825.00 403.6 PAVEMENT JOINT ADHESIVE LF 47,700. .27 12,879.00 .25 11,925.00 954.00 403.99 TEMPORARY BITUMINOUS PAVEMENT TON 200. 90.00 18,000.00 70.00 14,000.00 4,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 5,600. 2.80 15,680.00 2.00 11,200.00 4,480.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 65,000.00 65,000.00 200,000.00 200,000.00 -135,000.00 503.101 WATER DIVERSION STRUCTURE U 1. 4,500.00 4,500.00 5,000.00 5,000.00 -500.00 503.201 COFFERDAMS U 1. 31,000.00 31,000.00 15,000.00 15,000.00 16,000.00 503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U 1. 15,500.00 15,500.00 5,000.00 5,000.00 10,500.00 508. STRUCTURAL FILL CY 460. 35.75 16,445.00 27.00 12,420.00 4,025.00 520.1 CONCRETE CLASS A CY 9. 375.00 3,375.00 500.00 4,500.00 -1,125.00 520.2 CONCRETE CLASS B CY 95. 285.00 27,075.00 285.00 27,075.00 520.421 CONCRETE CLASS F, FLOWABLE FILL, EXCAVATABLE CY 73. 150.00 10,950.00 115.00 8,395.00 2,555.00 544.1 REINFORCING STEEL (ROADWAY) LB 7,700. .95 7,315.00 1.00 7,700.00 -385.00 570.4 MORTAR RUBBLE MASONRY (F) CY 7. 500.00 3,500.00 420.00 2,940.00 560.00 585.2 STONE FILL, CLASS B CY 62. 18.00 1,116.00 30.00 1,860.00 -744.00 585.3 STONE FILL, CLASS C CY 140. 34.50 4,830.00 30.00 4,200.00 630.00 585.5 STONE FILL, CLASS E CY 380. 31.00 11,780.00 31.00 11,780.00 13455A PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 585.7 STONE FILL, CLASS G CY 62. 34.25 2,123.50 32.00 1,984.00 139.50 593.321 GEOTEXTILE; STABILIZATION CL.2, NON-WOVEN SY 2,900. 2.00 5,800.00 3.00 8,700.00 -2,900.00 593.421 GEOTEXTILE; PERM CONTROL CL.2, NON-WOVEN SY 610. 2.00 1,220.00 2.50 1,525.00 -305.00 603.0001 VIDEO INSPECTION LF 4,600. .70 3,220.00 1.00 4,600.00 -1,380.00 603.00212 12" R.C. PIPE, 2000D LF 150. 46.75 7,012.50 42.00 6,300.00 712.50 603.00215 15" R.C. PIPE, 2000D LF 810. 53.20 43,092.00 42.00 34,020.00 9,072.00 603.00218 18" R.C. PIPE, 2000D LF 850. 55.45 47,132.50 42.00 35,700.00 11,432.50 603.00224 24" R.C. PIPE, 2000D LF 850. 68.25 58,012.50 48.00 40,800.00 17,212.50 603.00312 12" R.C. PIPE, 3000D LF 180. 46.75 8,415.00 43.00 7,740.00 675.00 603.00315 15" R.C. PIPE, 3000D LF 300. 53.55 16,065.00 40.00 12,000.00 4,065.00 603.00318 18" R.C. PIPE, 3000D LF 220. 62.55 13,761.00 42.00 9,240.00 4,521.00 603.00324 24" R.C. PIPE, 3000D LF 520. 71.50 37,180.00 48.00 24,960.00 12,220.00 603.00330 30" R.C. PIPE, 3000D LF 570. 98.00 55,860.00 60.00 34,200.00 21,660.00 603.30112 12" R.C. END SECTIONS EA 1. 540.00 540.00 530.00 530.00 10.00 603.30115 15" R.C. END SECTIONS EA 1. 580.00 580.00 550.00 550.00 30.00 603.30124 24" R.C. END SECTIONS EA 1. 725.00 725.00 650.00 650.00 75.00 603.80010 10" PLASTIC PIPE LF 8. 50.00 400.00 25.00 200.00 200.00 603.80012 12" PLASTIC PIPE LF 35. 40.00 1,400.00 30.00 1,050.00 350.00 603.80015 15" PLASTIC PIPE LF 77. 38.50 2,964.50 32.00 2,464.00 500.50 604.0007 POLYETHYLENE LINER EA 51. 170.00 8,670.00 190.00 9,690.00 -1,020.00 604.12 CATCH BASINS TYPE B U 57. 1,800.00 102,600.00 1,900.00 108,300.00 -5,700.00 604.125 CATCH BASINS TYPE B, 5-FOOT DIAMETER U 4. 2,100.00 8,400.00 2,400.00 9,600.00 -1,200.00 604.1252 CATCH BASIN, TYPE B, 5' DIAM. DOUBLE GRATES U 1. 2,700.00 2,700.00 2,800.00 2,800.00 -100.00 604.225 DROP INLETS TYPE B, 5-FOOT DIAMETER U 1. 1,900.00 1,900.00 2,550.00 2,550.00 -650.00 604.325 DRAINAGE MANHOLES, 5-FOOT DIAMETER U 2. 2,400.00 4,800.00 2,600.00 5,200.00 -400.00 604.326 DRAINAGE MANHOLES, 6-FOOT DIAMETER U 1. 3,150.00 3,150.00 3,200.00 3,200.00 -50.00 604.328 DRAINAGE MANHOLES, 8-FOOT DIAMETER U 3. 7,085.00 21,255.00 6,500.00 19,500.00 1,755.00 604.51 RECONSTRUCTING/ADJUSTING SEWER MANHOLES LF 15. 375.00 5,625.00 300.00 4,500.00 1,125.00 604.9101 OUTLET CONTROL STRUCTURE U 1. 4,850.00 4,850.00 3,500.00 3,500.00 1,350.00 604.921 LEACHING CHAMBER, TYPE 1 U 6. 1,700.00 10,200.00 2,200.00 13,200.00 -3,000.00 604.922 LEACHING CHAMBER, TYPE 2 U 5. 1,850.00 9,250.00 2,200.00 11,000.00 -1,750.00 605.506 6" PERF. CORR. POLYETHYL PIPE UND. LF 3,000. 19.50 58,500.00 17.00 51,000.00 7,500.00 605.79 UNDERDRAIN FLUSHING BASINS EA 2. 450.00 900.00 350.00 700.00 200.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 640. 20.00 12,800.00 16.50 10,560.00 2,240.00 606.1255 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 25 FT) (STEEL POST) U 2. 1,650.00 3,300.00 1,650.00 3,300.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 2,200. 18.00 39,600.00 20.00 44,000.00 -4,400.00 606.9522 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 2 U 5. 3,500.00 17,500.00 3,400.00 17,000.00 500.00 13455A PAGE 4 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 607.360 CHAIN LINK FENCE WITH VINYL COATED STEEL FABRIC, 6' HIGH LF 620. 22.08 13,689.60 20.00 12,400.00 1,289.60 607.4260 POST ASSEMBLIES FOR CHAIN LINK FENCE, 6' HIGH EA 12. 170.00 2,040.00 140.00 1,680.00 360.00 607.73612 12' OPENING DOUBLE GATE CHAIN LINK VINYL COATED STEEL FABRIC, 6' HIGH U 1. 1,285.00 1,285.00 1,500.00 1,500.00 -215.00 608.12 2" BITUMINOUS SIDEWALK (F) SY 21. 15.00 315.00 19.00 399.00 -84.00 608.26 6" CONCRETE SIDEWALK (F) SY 1,527. 38.00 58,026.00 42.00 64,134.00 -6,108.00 608.34 4" REINFORCED CONCRETE SIDEWALK (F) SY 2,482. 36.50 90,593.00 30.00 74,460.00 16,133.00 608.36 6" REINFORCED CONCRETE SIDEWALK (F) SY 59. 39.50 2,330.50 45.00 2,655.00 -324.50 608.52 TRUNCATED DOME PAVERS (DETECTABLE WARNING PAVERS) SY 11. 385.00 4,235.00 350.00 3,850.00 385.00 609.01 STRAIGHT GRANITE CURB LF 2,200. 17.00 37,400.00 18.00 39,600.00 -2,200.00 609.02 CURVED GRANITE CURB LF 350. 26.25 9,187.50 28.00 9,800.00 -612.50 609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF 850. 15.65 13,302.50 14.00 11,900.00 1,402.50 609.226 STRAIGHT GRANITE SLOPE CURB WITH RADIAL JOINTS, 6" HIGH LF 97. 15.65 1,518.05 14.00 1,358.00 160.05 609.5 RESET GRANITE CURB LF 6,080. 6.10 37,088.00 7.00 42,560.00 -5,472.00 609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF 30. 15.00 450.00 4.50 135.00 315.00 611.05206 6" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 105. 75.00 7,875.00 70.00 7,350.00 525.00 611.05208 8" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 105. 85.00 8,925.00 48.00 5,040.00 3,885.00 611.05212 12" CEMENT LINED DUCTILE IRON WATER PIPE, CL 52 LF 1,550. 80.00 124,000.00 105.00 162,750.00 -38,750.00 611.31004 4" DUCTILE IRON GATE VALVE EA 1. 700.00 700.00 1,300.00 1,300.00 -600.00 611.31006 6" DUCTICLE IRON GATE VALVE EA 4. 785.00 3,140.00 580.00 2,320.00 820.00 611.31008 8" DUCTICLE IRON GATE VALVE EA 2. 1,200.00 2,400.00 1,300.00 2,600.00 -200.00 611.31012 12" DUCTICLE IRON GATE VALVE EA 3. 2,100.00 6,300.00 1,200.00 3,600.00 2,700.00 611.5011 1" COPPER WATER PIPE LF 40. 32.00 1,280.00 30.00 1,200.00 80.00 611.5012 2" COPPER WATER PIPE LF 215. 42.50 9,137.50 36.00 7,740.00 1,397.50 611.50301 1" COPPER TUBING LF 20. 32.00 640.00 20.00 400.00 240.00 611.5101 1" CORPORATION STOP EA 2. 250.00 500.00 225.00 450.00 50.00 611.5102 2" CORPORATION STOP EA 3. 350.00 1,050.00 300.00 900.00 150.00 611.5201 1" CURB STOP AND BOX EA 2. 220.00 440.00 245.00 490.00 -50.00 611.5202 2" CURB STOP AND BOX EA 3. 400.00 1,200.00 415.00 1,245.00 -45.00 611.70004 4" DUCTILE IRON WATER MAIN FITTINGS EA 1. 515.00 515.00 128.00 128.00 387.00 611.70006 6" FITTING EA 4. 400.00 1,600.00 450.00 1,800.00 -200.00 13455A PAGE 5 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 611.70008 8" FITTING EA 8. 625.00 5,000.00 370.00 2,960.00 2,040.00 611.70012 12" FITTING EA 18. 900.00 16,200.00 450.00 8,100.00 8,100.00 611.81 HYDRANTS EA 1. 3,500.00 3,500.00 2,700.00 2,700.00 800.00 611.90001 ADJUSTING WATER GATES AND SHUTOFFS SET BY OTHERS EA 15. 200.00 3,000.00 95.00 1,425.00 1,575.00 611.951 WATER MAIN INSULATION SY 10. 20.00 200.00 20.00 200.00 612.33036 36" SPLIT SLEEVE STEEL CASING PIPE LF 16. 1,060.00 16,960.00 1,000.00 16,000.00 960.00 612.70010 10" PVC SEWER FITTING EA 2. 885.00 1,770.00 500.00 1,000.00 770.00 614.511 CONCRETE PULL BOX 14" EA 22. 295.80 6,507.60 290.00 6,380.00 127.60 614.523 MOLDED PULL BOX 17"X30" EA 3. 341.25 1,023.75 380.00 1,140.00 -116.25 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 2,000. 6.30 12,600.00 7.00 14,000.00 -1,400.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 660. 10.20 6,732.00 12.00 7,920.00 -1,188.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 30. 100.00 3,000.00 100.00 3,000.00 615.03 TRAFFIC SIGN TYPE C (F) SF 272. 36.00 9,792.00 40.00 10,880.00 -1,088.00 615.034 RELOCATING TRAFFIC SIGN, TYPE C U 2. 250.00 500.00 150.00 300.00 200.00 615.04 TRAFFIC SIGN TYPE AA (F) SF 542. 17.00 9,214.00 17.00 9,214.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 14. 12.00 168.00 20.00 280.00 -112.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 69. 10.00 690.00 11.00 759.00 -69.00 615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 38,850.00 38,850.00 35,000.00 35,000.00 3,850.00 615.20002 CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 38,850.00 38,850.00 35,000.00 35,000.00 3,850.00 615.20301 REMOVING CANTILEVER TRAFFIC SIGN STRUCTURE U 1. 4,250.00 4,250.00 6,000.00 6,000.00 -1,750.00 616.101 TRAFFIC SIGNALS U 1. 84,660.00 84,660.00 85,000.00 85,000.00 -340.00 616.161 TRAFFIC SIGNALS (TEMP.) U 1. 19,890.00 19,890.00 75,000.00 75,000.00 -55,110.00 616.162 TRAFFIC SIGNALS (TEMP.) U 1. 8,915.00 8,915.00 20,000.00 20,000.00 -11,085.00 616.163 TRAFFIC SIGNALS (TEMP.) U 1. 3,570.00 3,570.00 10,000.00 10,000.00 -6,430.00 616.191 ALTERATIONS TO TRAFFIC SIGNALS U 1. 11,985.00 11,985.00 45,000.00 45,000.00 -33,015.00 616.192 ALTERATIONS TO TRAFFIC SIGNALS U 1. 23,640.00 23,640.00 40,000.00 40,000.00 -16,360.00 616.193 ALTERATIONS TO TRAFFIC SIGNALS U 1. 8,100.00 8,100.00 15,000.00 15,000.00 -6,900.00 616.194 ALTERATIONS TO TRAFFIC SIGNALS U 1. 5,510.00 5,510.00 13,000.00 13,000.00 -7,490.00 616.195 ALTERATIONS TO TRAFFIC SIGNALS U 1. 7,275.00 7,275.00 16,000.00 16,000.00 -8,725.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 76,000.00 76,000.00 76,000.00 76,000.00 618.7 FLAGGERS HR 4,200. 21.00 88,200.00 20.00 84,000.00 4,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 70,000.00 70,000.00 150,000.00 150,000.00 -80,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 7,200.00 21,600.00 5,500.00 16,500.00 5,100.00 619.501 SMART WORK ZONE DEPLOYMENT U 1. 1,725.00 1,725.00 15,000.00 15,000.00 -13,275.00 619.502 SMART WORK ZONE OPERATIONAL COST (WINTER) MON 8. 205.00 1,640.00 3,500.00 28,000.00 -26,360.00 13455A PAGE 6 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 619.503 SMART WORK ZONE OPERATIONAL COST (SUMMER) MON 14. 70.00 980.00 1,000.00 14,000.00 -13,020.00 619.52 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) MON 66. 400.00 26,400.00 850.00 56,100.00 -29,700.00 619.91 RELOCATE SMART WORK ZONE DEVICE U 2. 300.00 600.00 325.00 650.00 -50.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 11. 5.00 55.00 4.00 44.00 11.00 621.31 SINGLE DELINEATOR WITH POST EA 5. 32.00 160.00 30.00 150.00 10.00 621.33 SINGLE DELINEATOR DOUBLE FACED WITH POST EA 51. 35.00 1,785.00 32.00 1,632.00 153.00 622.1 STEEL WITNESS MARKERS EA 8. 30.00 240.00 26.00 208.00 32.00 622.2 CONCRETE BOUNDS EA 17. 390.00 6,630.00 290.00 4,930.00 1,700.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,100. 1.50 1,650.00 1.00 1,100.00 550.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 87,300. .13 11,349.00 .11 9,603.00 1,746.00 632.0118 RETROREFLECTIVE PAINT PAVE. MARKING, 18" LINE LF 800. 1.25 1,000.00 1.50 1,200.00 -200.00 632.02 RETROREFLECTIVE PAINT PAVEMENT MARKING, SYMBOL OR WORD SF 1,303. 1.75 2,280.25 1.50 1,954.50 325.75 632.3104 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 4" LINE LF 2,400. .45 1,080.00 .50 1,200.00 -120.00 632.3106 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 6" LINE LF 790. .58 458.20 1.00 790.00 -331.80 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 530. 2.45 1,298.50 2.90 1,537.00 -238.50 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 844. 4.65 3,924.60 5.00 4,220.00 -295.40 632.911 OBLITERATE PAVE. MARKING LINE, 12" WIDE & UNDER LF 20,700. .35 7,245.00 .30 6,210.00 1,035.00 632.912 OBLITERATE PAVE. MARKING LINE, OVER 12" WIDE LF 280. .95 266.00 1.50 420.00 -154.00 632.92 OBLITERATE PAVEMENT MARKING, SYMBOL OR WORD SF 465. .95 441.75 1.00 465.00 -23.25 641. LOAM CY 2,000. 20.00 40,000.00 22.00 44,000.00 -4,000.00 643.22 FERTILIZER FOR REFERTILIZATION TON 2. 785.00 1,570.00 700.00 1,400.00 170.00 644.62 WET BASIN/MEADOW SEED LB 14. 220.00 3,080.00 200.00 2,800.00 280.00 645.121 TEMPORARY MULCH WITH TACKIFIFERS SY 12,800. .20 2,560.00 .25 3,200.00 -640.00 645.3 EROSION STONE TON 1,100. 20.00 22,000.00 20.00 22,000.00 645.44 TEMPORARY SLOPE STABILIZATION TYPE D (WILDLIFE FRIENDLY) SY 10,300. 1.80 18,540.00 1.70 17,510.00 1,030.00 645.45 PERMANENT CHANNEL STABILIZATION TYPE A SY 490. 3.90 1,911.00 3.00 1,470.00 441.00 645.531 SILT FENCE LF 4,900. 1.50 7,350.00 2.00 9,800.00 -2,450.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 4,465.00 4,465.00 3,000.00 3,000.00 1,465.00 13455A PAGE 7 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 420. 52.00 21,840.00 50.00 21,000.00 840.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 3. 1,835.00 5,505.00 1,800.00 5,400.00 105.00 647.1 HUMUS CY 370. 14.00 5,180.00 25.00 9,250.00 -4,070.00 647.29 WETLAND HUMUS CY 130. 16.00 2,080.00 18.00 2,340.00 -260.00 650.2 LANDSCAPING U 1. 25,500.00 25,500.00 20,000.00 20,000.00 5,500.00 660.82 INSTALL BUS SHELTER (SUPPLIED BY OTHERS) U 3. 2,000.00 6,000.00 2,500.00 7,500.00 -1,500.00 662.282 DECOMMISION MONITORING WELL LF 100. 5.00 500.00 50.00 5,000.00 -4,500.00 670.02 SEDIMENT SUMP MEASURING BLOCK EA 1. 250.00 250.00 350.00 350.00 -100.00 670.066 MAILBOX SUPPORT ASSEMBLIES EA 3. 150.00 450.00 150.00 450.00 670.95 TEMPORARY SAFETY FENCE LF 320. 2.50 800.00 5.00 1,600.00 -800.00 692. MOBILIZATION U 1. 220,000.00 220,000.00 181,294.00 181,294.00 38,706.00 693. ON-THE-JOB TRAINING OF UNSKILLED WORKERS $ 1. 600.00 600.00 600.00 600.00 697.11 INVASIVE SPECIES CONTROL AND MANAGEMENT PLAN U 1. 1,300.00 1,300.00 2,000.00 2,000.00 -700.00 697.21 PROJECT HEALTH AND SAFETY PLAN U 1. 1,840.00 1,840.00 3,000.00 3,000.00 -1,160.00 697.41 CRITICAL PATH METHOD (CPM) ELECTRONIC SCHEDULE U 1. 10,000.00 10,000.00 5,000.00 5,000.00 5,000.00 698.12 FIELD OFFICE TYPE B MON 24. 1,700.00 40,800.00 1,800.00 43,200.00 -2,400.00 698.2 PHYSICAL TESTING LABORATORY MON 22. 800.00 17,600.00 750.00 16,500.00 1,100.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 1008.53 ALTERATIONS AND ADDITIONS AS NEEDED - SOLID WASTE DISPOSAL $ 1. 5,000.00 5,000.00 5,000.00 5,000.00 1009.21 TREATMENT OR DISPOSAL OF CONTAMINATED GROUNDWATER (FRAC TANK) $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 1010.15 FUEL ADJUSTMENT $ 1. 40,000.00 40,000.00 40,000.00 40,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 25,000.00 25,000.00 25,000.00 25,000.00 1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA ASPHALT $ 1. 26,000.00 26,000.00 26,000.00 26,000.00 $4,317,581.60 $4,252,286.50 65,295.10