THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BOW-HOPKINTON X-A001(242), 16321 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: SEPTEMBER 12, 2012 SCOPE OF WORK: MEDIAN BARRIER PLACEMETN LOCATION: I-89 IN BOW-HOPKINTON COMPLETION DATE: AUGUST 23, 2013 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 1,915,786.72 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,064,148.00 C J.P. SICARD, INC. PO BOX 508, BARTON, VT 05822 $ 2,174.336.50 D F.L.MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,224,539.50 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,279,481.00 F R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,344,836.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,394,547.50 H NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 2,623,000.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.6 CURB REMOVAL FOR STORAGE LF 3,250. 2.50 8,125.00 2.00 6,500.00 3.00 9,750.00 202.7 REMOVAL OF GUARDRAIL LF 15,000. .46 6,900.00 .75 11,250.00 1.00 15,000.00 202.74 REMOVAL OF CONCRETE BARRIER LF 300. 7.25 2,175.00 10.00 3,000.00 17.00 5,100.00 203.1 COMMON EXCAVATION CY 12,300. 4.75 58,425.00 10.00 123,000.00 9.00 110,700.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 8. 1,100.00 8,800.00 1,200.00 9,600.00 1,500.00 12,000.00 203.5596 GUARDRAIL E-2 PLATFORM LF 302. 16.00 4,832.00 15.00 4,530.00 10.00 3,020.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 50.00 1,000.00 50.00 1,000.00 21.00 420.00 304.201 GRAVEL CY 15,600. 14.50 226,200.00 18.00 280,800.00 11.50 179,400.00 304.301 CRUSHED GRAVEL CY 640. 20.75 13,280.00 25.00 16,000.00 30.00 19,200.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 240. 25.00 6,000.00 18.00 4,320.00 40.00 9,600.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 240. 96.00 23,040.00 95.00 22,800.00 99.00 23,760.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 300. 112.00 33,600.00 110.00 33,000.00 109.00 32,700.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,000. 1.25 11,250.00 .50 4,500.00 .25 2,250.00 16321 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417. COLD PLANING BITUMINOUS SURFACES SY 1,400. 5.10 7,140.00 5.00 7,000.00 15.00 21,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 10,500.00 10,500.00 20,000.00 20,000.00 9,800.00 9,800.00 520.01 CONCRETE CLASS AA CY 7. 1,350.00 9,450.00 650.00 4,550.00 717.00 5,019.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 72. 46.60 3,355.20 45.00 3,240.00 47.00 3,384.00 544. REINFORCING STEEL (F) LB 438. 4.10 1,795.80 4.00 1,752.00 2.00 876.00 603.00212 12" R.C. PIPE, 2000D LF 32. 69.45 2,222.40 75.00 2,400.00 97.00 3,104.00 604.0007 POLYETHYLENE LINER EA 4. 170.00 680.00 125.00 500.00 176.00 704.00 604.12 CATCH BASINS TYPE B U 4. 1,800.00 7,200.00 2,200.00 8,800.00 3,475.00 13,900.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 85. 350.00 29,750.00 350.00 29,750.00 445.00 37,825.00 604.40092 MODIFY EXISTING BARREL BLOCK CATCH BASINS W/ ECCENTRIC CONE U 10. 1,000.00 10,000.00 600.00 6,000.00 2,072.00 20,720.00 606.0157 FURNISH STEEL POSTS, (NU-GUARD) 6'-6" EA 255. 33.66 8,583.30 33.00 8,415.00 49.00 12,495.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 4,300. 16.32 70,176.00 16.00 68,800.00 17.00 73,100.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 8. 1,963.50 15,708.00 1,925.00 15,400.00 1,835.00 14,680.00 606.1257 MEDIAN IMPACT ATTENUATOR (XTENSION) U 6. 9,700.00 58,200.00 9,510.00 57,060.00 9,305.00 55,830.00 606.1258 NU-GUARD TRANSITION SEGMENT LF 300. 60.18 18,054.00 59.00 17,700.00 26.00 7,800.00 606.1296 BEAM GUARDRAIL (TERM. UNI TYPE E-2) (STEEL POST) LF 302. 28.56 8,625.12 28.00 8,456.00 30.00 9,060.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 25. 484.50 12,112.50 475.00 11,875.00 418.00 10,450.00 606.15808 STEEL BEAM GUARDRAIL, STEEL POSTS(NU-GUARD) LF 3,075. 16.32 50,184.00 16.00 49,200.00 18.00 55,350.00 606.16200 STEEL BEAM GUARDRAIL, STEEL POSTS(MINI-SPACER) LF 1,700. 18.87 32,079.00 18.50 31,450.00 20.00 34,000.00 606.169 FURNISH GREGORY MINI-SPACER BOLT ASSEMBLY EA 220. 11.73 2,580.60 12.00 2,640.00 18.00 3,960.00 606.25808 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (NU-GUARD) LF 12,800. 22.44 287,232.00 22.00 281,600.00 24.00 307,200.00 606.26200 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (MINI-SPACER) LF 5,800. 24.38 141,404.00 24.00 139,200.00 28.00 162,400.00 606.26260 MINI-SPACER TRANSITION SEGMENT LF 75. 61.20 4,590.00 60.00 4,500.00 40.00 3,000.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 8. 2,500.00 20,000.00 2,450.00 19,600.00 2,515.00 20,120.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 12. 4,175.00 50,100.00 4,090.00 49,080.00 3,590.00 43,080.00 16321 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 16. 1,750.00 28,000.00 1,600.00 25,600.00 1,440.00 23,040.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 880. 80.50 70,840.00 83.00 73,040.00 95.00 83,600.00 606.4139 SINGLE SLOPE CONCRETE BARRIER (MODIFIED), PRECAST LF 1,520. 95.75 145,540.00 95.00 144,400.00 114.00 173,280.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 3,300. 18.00 59,400.00 15.00 49,500.00 32.50 107,250.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 3,500.00 7,000.00 3,500.00 7,000.00 4,000.00 8,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 60. 21.50 1,290.00 25.00 1,500.00 20.00 1,200.00 619.1 MAINTENANCE OF TRAFFIC U 1. 47,000.00 47,000.00 100,000.00 100,000.00 50,000.00 50,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,400.00 4,800.00 2,500.00 5,000.00 4,000.00 8,000.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 5,600.00 22,400.00 5,000.00 20,000.00 1,500.00 6,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 18,500.00 18,500.00 10,000.00 10,000.00 7,500.00 7,500.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 45. 15.30 688.50 15.00 675.00 16.00 720.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 530. 3.06 1,621.80 3.00 1,590.00 4.50 2,385.00 621.31 SINGLE DELINEATOR WITH POST EA 320. 30.60 9,792.00 30.00 9,600.00 29.00 9,280.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,850. 1.20 4,620.00 1.00 3,850.00 1.00 3,850.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 7,050. .21 1,480.50 .50 3,525.00 .55 3,877.50 645.3 EROSION STONE TON 200. 22.65 4,530.00 20.00 4,000.00 30.00 6,000.00 645.531 SILT FENCE LF 1,800. 2.50 4,500.00 2.50 4,500.00 2.00 3,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,475.00 1,475.00 1,500.00 1,500.00 2,415.00 2,415.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 60. 52.00 3,120.00 50.00 3,000.00 67.00 4,020.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 14. 1,750.00 24,500.00 1,650.00 23,100.00 1,933.00 27,062.00 647.1 HUMUS CY 560. 14.00 7,840.00 25.00 14,000.00 25.00 14,000.00 670.104 TEMPORARY PORTABLE LIGHTING U 2. 3,500.00 7,000.00 2,500.00 5,000.00 7,000.00 14,000.00 692. MOBILIZATION U 1. 60,000.00 60,000.00 70,000.00 70,000.00 149,000.00 149,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 16321 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 $1,915,786.72 $2,064,148.00 $2,174,336.50 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BOW-HOPKINTON X-A001(242), 16321 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: SEPTEMBER 12, 2012 SCOPE OF WORK: MEDIAN BARRIER PLACEMETN LOCATION: I-89 IN BOW-HOPKINTON COMPLETION DATE: AUGUST 23, 2013 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 1,915,786.72 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,064,148.00 C J.P. SICARD, INC. PO BOX 508, BARTON, VT 05822 $ 2,174.336.50 D F.L.MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,224,539.50 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,279,481.00 F R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,344,836.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,394,547.50 H NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 2,623,000.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.6 CURB REMOVAL FOR STORAGE LF 3,250. 3.00 9,750.00 4.00 13,000.00 3.00 9,750.00 202.7 REMOVAL OF GUARDRAIL LF 15,000. .80 12,000.00 2.00 30,000.00 .60 9,000.00 202.74 REMOVAL OF CONCRETE BARRIER LF 300. 13.60 4,080.00 11.50 3,450.00 5.00 1,500.00 203.1 COMMON EXCAVATION CY 12,300. 8.50 104,550.00 10.00 123,000.00 12.00 147,600.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 8. 1,140.00 9,120.00 2,500.00 20,000.00 1,400.00 11,200.00 203.5596 GUARDRAIL E-2 PLATFORM LF 302. 23.00 6,946.00 40.00 12,080.00 28.00 8,456.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 27.50 550.00 100.00 2,000.00 80.00 1,600.00 304.201 GRAVEL CY 15,600. 21.00 327,600.00 17.00 265,200.00 25.00 390,000.00 304.301 CRUSHED GRAVEL CY 640. 26.60 17,024.00 26.00 16,640.00 28.00 17,920.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 240. 32.00 7,680.00 40.00 9,600.00 16.00 3,840.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 240. 97.00 23,280.00 106.00 25,440.00 95.00 22,800.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 300. 110.00 33,000.00 120.00 36,000.00 98.00 29,400.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,000. .25 2,250.00 1.70 15,300.00 .60 5,400.00 16321 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417. COLD PLANING BITUMINOUS SURFACES SY 1,400. 5.20 7,280.00 8.00 11,200.00 10.00 14,000.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 25,000.00 25,000.00 28,000.00 28,000.00 33,000.00 33,000.00 520.01 CONCRETE CLASS AA CY 7. 1,000.00 7,000.00 1,000.00 7,000.00 450.00 3,150.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 72. 45.00 3,240.00 50.00 3,600.00 45.00 3,240.00 544. REINFORCING STEEL (F) LB 438. 2.50 1,095.00 2.00 876.00 2.00 876.00 603.00212 12" R.C. PIPE, 2000D LF 32. 88.00 2,816.00 110.00 3,520.00 60.00 1,920.00 604.0007 POLYETHYLENE LINER EA 4. 160.00 640.00 130.00 520.00 225.00 900.00 604.12 CATCH BASINS TYPE B U 4. 3,000.00 12,000.00 3,000.00 12,000.00 2,300.00 9,200.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 85. 300.00 25,500.00 1,000.00 85,000.00 450.00 38,250.00 604.40092 MODIFY EXISTING BARREL BLOCK CATCH BASINS W/ ECCENTRIC CONE U 10. 570.00 5,700.00 1,750.00 17,500.00 1,100.00 11,000.00 606.0157 FURNISH STEEL POSTS, (NU-GUARD) 6'-6" EA 255. 35.50 9,052.50 36.00 9,180.00 40.00 10,200.00 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 4,300. 17.20 73,960.00 18.00 77,400.00 15.60 67,080.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 8. 2,000.00 16,000.00 2,000.00 16,000.00 1,750.00 14,000.00 606.1257 MEDIAN IMPACT ATTENUATOR (XTENSION) U 6. 10,000.00 60,000.00 10,000.00 60,000.00 8,800.00 52,800.00 606.1258 NU-GUARD TRANSITION SEGMENT LF 300. 63.00 18,900.00 67.00 20,100.00 25.00 7,500.00 606.1296 BEAM GUARDRAIL (TERM. UNI TYPE E-2) (STEEL POST) LF 302. 30.00 9,060.00 30.00 9,060.00 26.00 7,852.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 25. 510.00 12,750.00 500.00 12,500.00 400.00 10,000.00 606.15808 STEEL BEAM GUARDRAIL, STEEL POSTS(NU-GUARD) LF 3,075. 17.00 52,275.00 18.00 55,350.00 16.00 49,200.00 606.16200 STEEL BEAM GUARDRAIL, STEEL POSTS(MINI-SPACER) LF 1,700. 19.90 33,830.00 20.00 34,000.00 18.00 30,600.00 606.169 FURNISH GREGORY MINI-SPACER BOLT ASSEMBLY EA 220. 12.00 2,640.00 13.00 2,860.00 14.00 3,080.00 606.25808 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (NU-GUARD) LF 12,800. 23.00 294,400.00 24.00 307,200.00 22.20 284,160.00 606.26200 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (MINI-SPACER) LF 5,800. 25.00 145,000.00 27.00 156,600.00 26.00 150,800.00 606.26260 MINI-SPACER TRANSITION SEGMENT LF 75. 64.00 4,800.00 65.00 4,875.00 42.00 3,150.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 8. 2,600.00 20,800.00 2,650.00 21,200.00 2,400.00 19,200.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 12. 4,300.00 51,600.00 4,500.00 54,000.00 3,400.00 40,800.00 16321 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 16. 2,200.00 35,200.00 1,600.00 25,600.00 2,000.00 32,000.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 880. 105.00 92,400.00 100.00 88,000.00 110.00 96,800.00 606.4139 SINGLE SLOPE CONCRETE BARRIER (MODIFIED), PRECAST LF 1,520. 120.00 182,400.00 90.00 136,800.00 100.00 152,000.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 3,300. 35.00 115,500.00 25.00 82,500.00 19.00 62,700.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 8,000.00 16,000.00 4,000.00 8,000.00 6,200.00 12,400.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 60. 23.00 1,380.00 27.00 1,620.00 17.00 1,020.00 619.1 MAINTENANCE OF TRAFFIC U 1. 18,360.00 18,360.00 57,000.00 57,000.00 65,000.00 65,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 5,400.00 10,800.00 5,500.00 11,000.00 12,000.00 24,000.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 8,000.00 32,000.00 3,900.00 15,600.00 7,500.00 30,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 19,260.00 19,260.00 11,000.00 11,000.00 15,000.00 15,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 45. 16.00 720.00 16.00 720.00 12.00 540.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 530. 3.20 1,696.00 4.00 2,120.00 4.00 2,120.00 621.31 SINGLE DELINEATOR WITH POST EA 320. 32.00 10,240.00 32.00 10,240.00 28.00 8,960.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,850. .75 2,887.50 2.00 7,700.00 1.00 3,850.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 7,050. .55 3,877.50 .20 1,410.00 .20 1,410.00 645.3 EROSION STONE TON 200. 16.70 3,340.00 22.00 4,400.00 24.00 4,800.00 645.531 SILT FENCE LF 1,800. 2.50 4,500.00 4.00 7,200.00 6.00 10,800.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,600.00 1,600.00 2,200.00 2,200.00 1,400.00 1,400.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 60. 54.00 3,240.00 63.00 3,780.00 50.00 3,000.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 14. 1,800.00 25,200.00 2,000.00 28,000.00 1,700.00 23,800.00 647.1 HUMUS CY 560. 30.00 16,800.00 14.00 7,840.00 32.70 18,312.00 670.104 TEMPORARY PORTABLE LIGHTING U 2. 12,900.00 25,800.00 5,500.00 11,000.00 4,000.00 8,000.00 692. MOBILIZATION U 1. 33,670.00 33,670.00 60,000.00 60,000.00 128,000.00 128,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 7,500.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 16321 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 $2,224,539.50 $2,279,481.00 $2,344,836.00 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BOW-HOPKINTON X-A001(242), 16321 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: SEPTEMBER 12, 2012 SCOPE OF WORK: MEDIAN BARRIER PLACEMETN LOCATION: I-89 IN BOW-HOPKINTON COMPLETION DATE: AUGUST 23, 2013 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 1,915,786.72 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,064,148.00 C J.P. SICARD, INC. PO BOX 508, BARTON, VT 05822 $ 2,174.336.50 D F.L.MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,224,539.50 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,279,481.00 F R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,344,836.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,394,547.50 H NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 2,623,000.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 202.6 CURB REMOVAL FOR STORAGE LF 3,250. 1.00 3,250.00 4.50 14,625.00 202.7 REMOVAL OF GUARDRAIL LF 15,000. 1.00 15,000.00 .62 9,300.00 202.74 REMOVAL OF CONCRETE BARRIER LF 300. 3.00 900.00 12.50 3,750.00 203.1 COMMON EXCAVATION CY 12,300. 8.00 98,400.00 10.75 132,225.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 8. 1,250.00 10,000.00 1,750.00 14,000.00 203.5596 GUARDRAIL E-2 PLATFORM LF 302. 16.00 4,832.00 8.50 2,567.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 40.00 800.00 60.00 1,200.00 304.201 GRAVEL CY 15,600. 23.00 358,800.00 18.50 288,600.00 304.301 CRUSHED GRAVEL CY 640. 28.00 17,920.00 23.00 14,720.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 240. 35.00 8,400.00 32.00 7,680.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 240. 100.00 24,000.00 165.00 39,600.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 300. 114.00 34,200.00 180.00 54,000.00 403.6 PAVEMENT JOINT ADHESIVE LF 9,000. .26 2,340.00 .45 4,050.00 16321 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 417. COLD PLANING BITUMINOUS SURFACES SY 1,400. 4.00 5,600.00 11.50 16,100.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 15,000.00 15,000.00 20,000.00 20,000.00 520.01 CONCRETE CLASS AA CY 7. 600.00 4,200.00 500.00 3,500.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 72. 48.00 3,456.00 50.00 3,600.00 544. REINFORCING STEEL (F) LB 438. 2.00 876.00 2.00 876.00 603.00212 12" R.C. PIPE, 2000D LF 32. 193.00 6,176.00 60.00 1,920.00 604.0007 POLYETHYLENE LINER EA 4. 140.00 560.00 300.00 1,200.00 604.12 CATCH BASINS TYPE B U 4. 1,825.00 7,300.00 2,500.00 10,000.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 85. 700.00 59,500.00 350.00 29,750.00 604.40092 MODIFY EXISTING BARREL BLOCK CATCH BASINS W/ ECCENTRIC CONE U 10. 750.00 7,500.00 925.00 9,250.00 606.0157 FURNISH STEEL POSTS, (NU-GUARD) 6'-6" EA 255. 34.00 8,670.00 47.50 12,112.50 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 4,300. 18.00 77,400.00 16.75 72,025.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 8. 2,000.00 16,000.00 2,000.00 16,000.00 606.1257 MEDIAN IMPACT ATTENUATOR (XTENSION) U 6. 10,000.00 60,000.00 9,500.00 57,000.00 606.1258 NU-GUARD TRANSITION SEGMENT LF 300. 63.00 18,900.00 26.00 7,800.00 606.1296 BEAM GUARDRAIL (TERM. UNI TYPE E-2) (STEEL POST) LF 302. 30.00 9,060.00 29.50 8,909.00 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 25. 500.00 12,500.00 400.00 10,000.00 606.15808 STEEL BEAM GUARDRAIL, STEEL POSTS(NU-GUARD) LF 3,075. 18.00 55,350.00 17.00 52,275.00 606.16200 STEEL BEAM GUARDRAIL, STEEL POSTS(MINI-SPACER) LF 1,700. 20.00 34,000.00 19.00 32,300.00 606.169 FURNISH GREGORY MINI-SPACER BOLT ASSEMBLY EA 220. 12.00 2,640.00 17.50 3,850.00 606.25808 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (NU-GUARD) LF 12,800. 24.00 307,200.00 23.00 294,400.00 606.26200 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (MINI-SPACER) LF 5,800. 25.00 145,000.00 27.00 156,600.00 606.26260 MINI-SPACER TRANSITION SEGMENT LF 75. 64.00 4,800.00 39.00 2,925.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 8. 2,600.00 20,800.00 2,500.00 20,000.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 12. 4,200.00 50,400.00 3,575.00 42,900.00 16321 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 16. 1,900.00 30,400.00 2,150.00 34,400.00 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 880. 88.00 77,440.00 105.00 92,400.00 606.4139 SINGLE SLOPE CONCRETE BARRIER (MODIFIED), PRECAST LF 1,520. 102.00 155,040.00 115.00 174,800.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 3,300. 12.00 39,600.00 1.00 3,300.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 3,000.00 6,000.00 10,500.00 21,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 60. 22.00 1,320.00 18.00 1,080.00 619.1 MAINTENANCE OF TRAFFIC U 1. 50,000.00 50,000.00 290,780.00 290,780.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,800.00 5,600.00 4,500.00 9,000.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 5,000.00 20,000.00 4,500.00 18,000.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 5,000.00 5,000.00 15,000.00 15,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 45. 15.00 675.00 5.00 225.00 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 530. 3.00 1,590.00 4.35 2,305.50 621.31 SINGLE DELINEATOR WITH POST EA 320. 33.00 10,560.00 28.50 9,120.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,850. 1.50 5,775.00 1.00 3,850.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 7,050. .55 3,877.50 .60 4,230.00 645.3 EROSION STONE TON 200. 25.00 5,000.00 40.00 8,000.00 645.531 SILT FENCE LF 1,800. 2.00 3,600.00 2.00 3,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 12,400.00 12,400.00 5,000.00 5,000.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 60. 86.00 5,160.00 65.00 3,900.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 14. 1,800.00 25,200.00 1,950.00 27,300.00 647.1 HUMUS CY 560. 18.00 10,080.00 60.00 33,600.00 670.104 TEMPORARY PORTABLE LIGHTING U 2. 4,500.00 9,000.00 3,000.00 6,000.00 692. MOBILIZATION U 1. 285,000.00 285,000.00 270,000.00 270,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 7,500.00 7,500.00 7,500.00 7,500.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 16321 PAGE 4 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 $2,394,547.50 $2,623,000.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: BOW-HOPKINTON X-A001(242), 16321 COUNTIES AND CODES: MERRIMACK 013 DATE BIDS OPEN: SEPTEMBER 12, 2012 SCOPE OF WORK: MEDIAN BARRIER PLACEMETN LOCATION: I-89 IN BOW-HOPKINTON COMPLETION DATE: AUGUST 23, 2013 A WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 1,915,786.72 B CONTINENTAL PAVING, INC. 1 CONTINENTAL DRIVE, LONDONDERRY, NH 03053 $ 2,064,148.00 C J.P. SICARD, INC. PO BOX 508, BARTON, VT 05822 $ 2,174.336.50 D F.L.MERRILL CONSTRUCTION, INC. 619 SAND RD., PEMBROKE, NH 03275 $ 2,224,539.50 E NORTHEAST EARTH MECHANICS, INC. 159 BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 2,279,481.00 F R.S. AUDLEY, INC. 609 ROUTE 3A, BOW, NH 03304 $ 2,344,836.00 G CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 2,394,547.50 H NORTHERN CONSTRUCTION SERVICE, LLC 775 PLEASANT STREET, UNIT 11, WEYMOUTH, MA 02189 $ 2,623,000.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 202.6 CURB REMOVAL FOR STORAGE LF 3,250. 2.50 8,125.00 2.50 8,125.00 202.7 REMOVAL OF GUARDRAIL LF 15,000. .46 6,900.00 2.50 37,500.00 -30,600.00 202.74 REMOVAL OF CONCRETE BARRIER LF 300. 7.25 2,175.00 8.00 2,400.00 -225.00 203.1 COMMON EXCAVATION CY 12,300. 4.75 58,425.00 9.00 110,700.00 -52,275.00 203.5554 GUARDRAIL 50' EAGRT PLATFORM U 8. 1,100.00 8,800.00 1,100.00 8,800.00 203.5596 GUARDRAIL E-2 PLATFORM LF 302. 16.00 4,832.00 15.00 4,530.00 302.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 20. 50.00 1,000.00 30.00 600.00 400.00 304.201 GRAVEL CY 15,600. 14.50 226,200.00 18.00 280,800.00 -54,600.00 304.301 CRUSHED GRAVEL CY 640. 20.75 13,280.00 23.00 14,720.00 -1,440.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 240. 25.00 6,000.00 10.00 2,400.00 3,600.00 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 240. 96.00 23,040.00 80.00 19,200.00 3,840.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 300. 112.00 33,600.00 120.00 36,000.00 -2,400.00 16321 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.6 PAVEMENT JOINT ADHESIVE LF 9,000. 1.25 11,250.00 .50 4,500.00 6,750.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,400. 5.10 7,140.00 2.00 2,800.00 4,340.00 502.101 REMOVAL OF EXISTING BRIDGE STRUCTURE U 1. 10,500.00 10,500.00 25,000.00 25,000.00 -14,500.00 520.01 CONCRETE CLASS AA CY 7. 1,350.00 9,450.00 750.00 5,250.00 4,200.00 538.5 BARRIER MEMBRANE, HEAT WELDED (F) SY 72. 46.60 3,355.20 30.00 2,160.00 1,195.20 544. REINFORCING STEEL (F) LB 438. 4.10 1,795.80 3.00 1,314.00 481.80 603.00212 12" R.C. PIPE, 2000D LF 32. 69.45 2,222.40 60.00 1,920.00 302.40 604.0007 POLYETHYLENE LINER EA 4. 170.00 680.00 125.00 500.00 180.00 604.12 CATCH BASINS TYPE B U 4. 1,800.00 7,200.00 2,000.00 8,000.00 -800.00 604.4 RECONSTRUCTING/ADJUSTING CATCH BASIN & DROP INLET LF 85. 350.00 29,750.00 250.00 21,250.00 8,500.00 604.40092 MODIFY EXISTING BARREL BLOCK CATCH BASINS W/ ECCENTRIC CONE U 10. 1,000.00 10,000.00 1,475.00 14,750.00 -4,750.00 606.0157 FURNISH STEEL POSTS, (NU-GUARD) 6'-6" EA 255. 33.66 8,583.30 35.00 8,925.00 -341.70 606.120 BEAM GUARDRAIL (STANDARD SECTION) (STEEL POST) LF 4,300. 16.32 70,176.00 18.00 77,400.00 -7,224.00 606.1254 BEAM GUARDRAIL (TERM. UNI TYPE EAGRT 50 FT) (STEEL POST) U 8. 1,963.50 15,708.00 1,925.00 15,400.00 308.00 606.1257 MEDIAN IMPACT ATTENUATOR (XTENSION) U 6. 9,700.00 58,200.00 4,000.00 24,000.00 34,200.00 606.1258 NU-GUARD TRANSITION SEGMENT LF 300. 60.18 18,054.00 25.00 7,500.00 10,554.00 606.1296 BEAM GUARDRAIL (TERM. UNI TYPE E-2) (STEEL POST) LF 302. 28.56 8,625.12 27.00 8,154.00 471.12 606.147 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) U 25. 484.50 12,112.50 375.00 9,375.00 2,737.50 606.15808 STEEL BEAM GUARDRAIL, STEEL POSTS(NU-GUARD) LF 3,075. 16.32 50,184.00 18.00 55,350.00 -5,166.00 606.16200 STEEL BEAM GUARDRAIL, STEEL POSTS(MINI-SPACER) LF 1,700. 18.87 32,079.00 20.00 34,000.00 -1,921.00 606.169 FURNISH GREGORY MINI-SPACER BOLT ASSEMBLY EA 220. 11.73 2,580.60 7.50 1,650.00 930.60 606.25808 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (NU-GUARD) LF 12,800. 22.44 287,232.00 21.00 268,800.00 18,432.00 606.26200 DOUBLE-FACED STEEL BEAM GUARDRAIL, STEEL POSTS (MINI-SPACER) LF 5,800. 24.38 141,404.00 25.00 145,000.00 -3,596.00 606.26260 MINI-SPACER TRANSITION SEGMENT LF 75. 61.20 4,590.00 25.00 1,875.00 2,715.00 606.312 SINGLE FACED TRANSITION RAIL, STEEL POSTS U 8. 2,500.00 20,000.00 2,850.00 22,800.00 -2,800.00 606.322 DOUBLE FACED TRANSITION RAIL, STEEL POST U 12. 4,175.00 50,100.00 3,500.00 42,000.00 8,100.00 606.41231 TRANSITION SINGLE SLOPE CONCRETE BARRIER, PRECAS U 16. 1,750.00 28,000.00 4,500.00 72,000.00 -44,000.00 16321 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF 880. 80.50 70,840.00 75.00 66,000.00 4,840.00 606.4139 SINGLE SLOPE CONCRETE BARRIER (MODIFIED), PRECAST LF 1,520. 95.75 145,540.00 100.00 152,000.00 -6,460.00 606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 3,300. 18.00 59,400.00 20.00 66,000.00 -6,600.00 606.9523 TEMP. IMPACT ATTENUATION DEVICE (NON-REDIRECTIVE) TEST LEVEL 3 U 2. 3,500.00 7,000.00 3,800.00 7,600.00 -600.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 85,000.00 85,000.00 85,000.00 85,000.00 618.7 FLAGGERS HR 60. 21.50 1,290.00 20.00 1,200.00 90.00 619.1 MAINTENANCE OF TRAFFIC U 1. 47,000.00 47,000.00 75,000.00 75,000.00 -28,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 2. 2,400.00 4,800.00 2,500.00 5,000.00 -200.00 619.279 AUTOMATED TRAILER MOUNTED SPEED LIMIT SIGN U 4. 5,600.00 22,400.00 7,000.00 28,000.00 -5,600.00 619.63 TRUCK-MOUNTED IMPACT ATTENUATOR, TEST LEVEL 3 U 1. 18,500.00 18,500.00 7,500.00 7,500.00 11,000.00 621.1 RETROREFLECTIVE MEDIAN BARRIER DELINEATOR EA 45. 15.30 688.50 11.00 495.00 193.50 621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 530. 3.06 1,621.80 5.00 2,650.00 -1,028.20 621.31 SINGLE DELINEATOR WITH POST EA 320. 30.60 9,792.00 30.00 9,600.00 192.00 628.2 SAWED BITUMINOUS PAVEMENT LF 3,850. 1.20 4,620.00 2.20 8,470.00 -3,850.00 632.0106 RETROREFLECTIVE PAINT PAVE. MARKING, 6" LINE LF 7,050. .21 1,480.50 .14 987.00 493.50 645.3 EROSION STONE TON 200. 22.65 4,530.00 25.00 5,000.00 -470.00 645.531 SILT FENCE LF 1,800. 2.50 4,500.00 3.00 5,400.00 -900.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,475.00 1,475.00 2,000.00 2,000.00 -525.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 60. 52.00 3,120.00 60.00 3,600.00 -480.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 14. 1,750.00 24,500.00 2,100.00 29,400.00 -4,900.00 647.1 HUMUS CY 560. 14.00 7,840.00 30.00 16,800.00 -8,960.00 670.104 TEMPORARY PORTABLE LIGHTING U 2. 3,500.00 7,000.00 7,000.00 14,000.00 -7,000.00 692. MOBILIZATION U 1. 60,000.00 60,000.00 67,425.00 67,425.00 -7,425.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 7,500.00 7,500.00 7,500.00 7,500.00 1002.1 REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE STRUCTURES $ 1. 2,000.00 2,000.00 2,000.00 2,000.00 1010.15 FUEL ADJUSTMENT $ 1. 20,000.00 20,000.00 20,000.00 20,000.00 $1,915,786.72 $2,096,075.00 -180,288.28