THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BARNSTEAD X-A001(180), 16200 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 10, 2012 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: NH 28, NH 126 AND WES LOCKE ROAD IN BARNSTEAD COMPLETION DATE: JUNE 28, 2013 A CONNIES SEPTIC SERVICE, INC. D/B/A CSSI 513 DONALD ST., BEDFORD, NH 03110 $ 817,424.87 B F.L. MERRILL CONSTRUCTION, INC. 61. SAND RD., PEMBROKE, NH 03275 $ 820,139.89 C WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 825,501.61 D AMERICAN EXCAVATING CORPORATION 5 MADDEN RD., PO BOX 1220, DERRY, NH 03820 $ 827,777.45 E G.W. BROOKS AND SON, INC. 362 EATON RD., FREEDOM, NH 03836 $ 838,184.01 F PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 839,725.77 G J. PARKER & DAUGHTERS, INC. 70 DAROSKA RD., PITTSFIELD, NH 03263 $ 845,562.30 H NORTHEAST EARTH MECHANICS, INC. 15. BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 848,469.62 I CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 1,085,054.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .8 10,375.00 8,300.00 5,800.00 4,640.00 4,000.00 3,200.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 12. 20.00 240.00 16.40 196.80 10.00 120.00 203.1 COMMON EXCAVATION CY 4,600. 4.00 18,400.00 7.45 34,270.00 10.00 46,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 650. 10.00 6,500.00 2.80 1,820.00 4.95 3,217.50 206.1 COMMON STRUCTURE EXCAVATION CY 36. 20.00 720.00 28.00 1,008.00 15.00 540.00 209.1 GRANULAR BACKFILL CY 50. 50.00 2,500.00 18.35 917.50 50.00 2,500.00 214. FINE GRADING U 1. 6,000.00 6,000.00 6,000.00 6,000.00 7,500.00 7,500.00 304.1 SAND (F) CY 1,640. 12.00 19,680.00 10.50 17,220.00 14.00 22,960.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 450. 25.00 11,250.00 34.45 15,502.50 25.00 11,250.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 50. 35.00 1,750.00 17.50 875.00 35.00 1,750.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 975. 22.00 21,450.00 16.50 16,087.50 23.00 22,425.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 1,550. 18.50 28,675.00 16.50 25,575.00 23.00 35,650.00 16200 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 800. 86.00 68,800.00 84.60 67,680.00 76.00 60,800.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 1,100. 89.50 98,450.00 88.00 96,800.00 82.00 90,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 130.00 9,750.00 112.60 8,445.00 120.00 9,000.00 403.6 PAVEMENT JOINT ADHESIVE LF 13,000. .30 3,900.00 .26 3,380.00 .50 6,500.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,900. 76.00 144,400.00 73.70 140,030.00 74.00 140,600.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 100. 125.00 12,500.00 112.60 11,260.00 82.00 8,200.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,200. 6.00 7,200.00 5.35 6,420.00 5.25 6,300.00 520.1 CONCRETE CLASS A CY 15. 300.00 4,500.00 512.00 7,680.00 600.00 9,000.00 544.1 REINFORCING STEEL (ROADWAY) LB 340. 2.00 680.00 3.10 1,054.00 2.00 680.00 585.3 STONE FILL, CLASS C CY 10. 50.00 500.00 46.75 467.50 50.00 500.00 585.4 STONE FILL, CLASS D CY 25. 50.00 1,250.00 49.20 1,230.00 50.00 1,250.00 608.26 6" CONCRETE SIDEWALK (F) SY 42. 75.00 3,150.00 73.60 3,091.20 45.00 1,890.00 609.01187 STRAIGHT GRANITE CURB, 18" HIGH W/3" ROUNDED EDGE LF 140. 60.00 8,400.00 51.75 7,245.00 51.00 7,140.00 609.02187 CURVED GRANITE CURB 18" HIGH W/3" ROUNDED EDGE LF 19. 70.00 1,330.00 61.50 1,168.50 59.00 1,121.00 614.512 CONCRETE PULL BOX 18" EA 10. 500.00 5,000.00 450.00 4,500.00 320.00 3,200.00 614.522 MOLDED PULL BOX 13"X24" EA 7. 350.00 2,450.00 318.00 2,226.00 275.00 1,925.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 600. 8.00 4,800.00 8.70 5,220.00 5.25 3,150.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 350. 15.00 5,250.00 14.65 5,127.50 12.30 4,305.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 86. 130.00 11,180.00 123.00 10,578.00 130.00 11,180.00 615.03 TRAFFIC SIGN TYPE C (F) SF 162.75 45.00 7,323.75 41.00 6,672.75 40.00 6,510.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 20. 27.00 540.00 25.60 512.00 12.60 252.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 33.82 16.00 541.12 15.35 519.14 10.50 355.11 616.101 TRAFFIC SIGNALS U 1. 80,250.00 80,250.00 87,000.00 87,000.00 79,000.00 79,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 618.7 FLAGGERS HR 1,700. 22.00 37,400.00 23.00 39,100.00 22.00 37,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 19,100.00 19,100.00 25,000.00 25,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 2,000.00 6,000.00 2,140.00 6,420.00 1,200.00 3,600.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 4,100.00 8,200.00 3,750.00 7,500.00 4,800.00 9,600.00 621.31 SINGLE DELINEATOR WITH POST EA 10. 75.00 750.00 36.00 360.00 30.00 300.00 622.1 STEEL WITNESS MARKERS EA 7. 50.00 350.00 36.00 252.00 35.00 245.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,100. 2.00 2,200.00 1.10 1,210.00 1.25 1,375.00 16200 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM A B C NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 16,000. .25 4,000.00 .20 3,200.00 .16 2,560.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 140. 5.50 770.00 5.10 714.00 2.65 371.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 350. 7.70 2,695.00 7.20 2,520.00 5.00 1,750.00 645.3 EROSION STONE TON 75. 50.00 3,750.00 23.00 1,725.00 25.00 1,875.00 645.531 SILT FENCE LF 4,200. 3.00 12,600.00 3.00 12,600.00 1.50 6,300.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,200.00 2,200.00 1,800.00 1,800.00 1,680.00 1,680.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 75.00 1,500.00 54.00 1,080.00 52.50 1,050.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1. 3,200.00 3,200.00 1,715.00 1,715.00 1,725.00 1,725.00 647.1 HUMUS CY 475. 12.00 5,700.00 23.00 10,925.00 20.00 9,500.00 692. MOBILIZATION U 1. 33,500.00 33,500.00 32,500.00 32,500.00 35,000.00 35,000.00 698.13 FIELD OFFICE TYPE C MON 10. 1,000.00 10,000.00 1,500.00 15,000.00 1,600.00 16,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 $817,424.87 $820,139.89 $825,501.61 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BARNSTEAD X-A001(180), 16200 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 10, 2012 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: NH 28, NH 126 AND WES LOCKE ROAD IN BARNSTEAD COMPLETION DATE: JUNE 28, 2013 A CONNIES SEPTIC SERVICE, INC. D/B/A CSSI 513 DONALD ST., BEDFORD, NH 03110 $ 817,424.87 B F.L. MERRILL CONSTRUCTION, INC. 61. SAND RD., PEMBROKE, NH 03275 $ 820,139.89 C WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 825,501.61 D AMERICAN EXCAVATING CORPORATION 5 MADDEN RD., PO BOX 1220, DERRY, NH 03820 $ 827,777.45 E G.W. BROOKS AND SON, INC. 362 EATON RD., FREEDOM, NH 03836 $ 838,184.01 F PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 839,725.77 G J. PARKER & DAUGHTERS, INC. 70 DAROSKA RD., PITTSFIELD, NH 03263 $ 845,562.30 H NORTHEAST EARTH MECHANICS, INC. 15. BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 848,469.62 I CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 1,085,054.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .8 6,046.43 4,837.14 5,155.50 4,124.40 2,040.00 1,632.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 12. 84.04 1,008.48 150.00 1,800.00 34.00 408.00 203.1 COMMON EXCAVATION CY 4,600. 7.96 36,616.00 4.60 21,160.00 10.50 48,300.00 203.6 EMBANKMENT-IN-PLACE (F) CY 650. 7.00 4,550.00 14.80 9,620.00 6.50 4,225.00 206.1 COMMON STRUCTURE EXCAVATION CY 36. 53.75 1,935.00 14.50 522.00 41.50 1,494.00 209.1 GRANULAR BACKFILL CY 50. 32.08 1,604.00 21.00 1,050.00 16.00 800.00 214. FINE GRADING U 1. 16,846.12 16,846.12 4,075.00 4,075.00 6,880.00 6,880.00 304.1 SAND (F) CY 1,640. 13.23 21,697.20 23.80 39,032.00 15.00 24,600.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 450. 21.28 9,576.00 30.00 13,500.00 23.25 10,462.50 304.35 CRUSHED GRAVEL FOR DRIVES CY 50. 44.97 2,248.50 26.50 1,325.00 35.00 1,750.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 975. 25.53 24,891.75 24.80 24,180.00 24.50 23,887.50 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 1,550. 23.79 36,874.50 21.60 33,480.00 20.50 31,775.00 16200 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 800. 82.62 66,096.00 78.00 62,400.00 75.50 60,400.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 1,100. 85.45 93,995.00 86.00 94,600.00 84.00 92,400.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 116.67 8,750.25 125.00 9,375.00 150.00 11,250.00 403.6 PAVEMENT JOINT ADHESIVE LF 13,000. .30 3,900.00 .46 5,980.00 .32 4,160.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,900. 72.53 137,807.00 78.50 149,150.00 75.50 143,450.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 100. 110.00 11,000.00 78.50 7,850.00 81.00 8,100.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,200. 5.29 6,348.00 3.20 3,840.00 5.50 6,600.00 520.1 CONCRETE CLASS A CY 15. 400.00 6,000.00 1,255.00 18,825.00 1,100.00 16,500.00 544.1 REINFORCING STEEL (ROADWAY) LB 340. 2.00 680.00 2.50 850.00 2.20 748.00 585.3 STONE FILL, CLASS C CY 10. 113.36 1,133.60 60.00 600.00 50.00 500.00 585.4 STONE FILL, CLASS D CY 25. 70.21 1,755.25 34.50 862.50 34.00 850.00 608.26 6" CONCRETE SIDEWALK (F) SY 42. 55.00 2,310.00 36.50 1,533.00 55.00 2,310.00 609.01187 STRAIGHT GRANITE CURB, 18" HIGH W/3" ROUNDED EDGE LF 140. 51.16 7,162.40 50.50 7,070.00 52.50 7,350.00 609.02187 CURVED GRANITE CURB 18" HIGH W/3" ROUNDED EDGE LF 19. 69.62 1,322.78 85.50 1,624.50 60.50 1,149.50 614.512 CONCRETE PULL BOX 18" EA 10. 450.00 4,500.00 370.00 3,700.00 334.00 3,340.00 614.522 MOLDED PULL BOX 13"X24" EA 7. 300.00 2,100.00 325.00 2,275.00 286.00 2,002.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 600. 7.00 4,200.00 5.50 3,300.00 5.40 3,240.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 350. 13.50 4,725.00 13.50 4,725.00 13.00 4,550.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 86. 120.00 10,320.00 130.50 11,223.00 138.00 11,868.00 615.03 TRAFFIC SIGN TYPE C (F) SF 162.75 40.00 6,510.00 43.50 7,079.63 41.00 6,672.75 615.05 TRAFFIC SIGN TYPE BB (F) SF 20. 25.00 500.00 27.20 544.00 13.00 260.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 33.82 15.00 507.30 16.30 551.27 11.00 372.02 616.101 TRAFFIC SIGNALS U 1. 75,000.00 75,000.00 83,618.00 83,618.00 83,000.00 83,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 618.7 FLAGGERS HR 1,700. 20.50 34,850.00 26.10 44,370.00 24.00 40,800.00 619.1 MAINTENANCE OF TRAFFIC U 1. 12,219.43 12,219.43 9,000.00 9,000.00 7,750.00 7,750.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 3,740.91 11,222.73 1,795.00 5,385.00 1,200.00 3,600.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 3,720.46 7,440.92 2,200.00 4,400.00 2,590.00 5,180.00 621.31 SINGLE DELINEATOR WITH POST EA 10. 35.00 350.00 38.00 380.00 34.50 345.00 622.1 STEEL WITNESS MARKERS EA 7. 45.00 315.00 43.50 304.50 37.50 262.50 628.2 SAWED BITUMINOUS PAVEMENT LF 1,100. 1.87 2,057.00 2.00 2,200.00 1.00 1,100.00 16200 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM D E F NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 16,000. .15 2,400.00 .30 4,800.00 .22 3,520.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 140. 2.55 357.00 5.60 784.00 4.30 602.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 350. 4.75 1,662.50 8.10 2,835.00 5.10 1,785.00 645.3 EROSION STONE TON 75. 27.76 2,082.00 23.00 1,725.00 26.00 1,950.00 645.531 SILT FENCE LF 4,200. 1.66 6,972.00 3.00 12,600.00 2.00 8,400.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 1,600.00 1,600.00 2,000.00 2,000.00 1,890.00 1,890.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 65.00 1,300.00 80.00 1,600.00 54.00 1,080.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1. 1,800.00 1,800.00 2,280.00 2,280.00 1,800.00 1,800.00 647.1 HUMUS CY 475. 18.91 8,982.25 36.60 17,385.00 25.00 11,875.00 692. MOBILIZATION U 1. 40,377.55 40,377.55 20,691.21 20,691.21 53,000.00 53,000.00 698.13 FIELD OFFICE TYPE C MON 10. 1,248.18 12,481.80 1,000.00 10,000.00 750.00 7,500.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 $827,777.45 $838,184.01 $839,725.77 THE STATE OF NEW HAMPSHIRE PAGE 1 DEPARTMENT OF TRANSPORTATION PROJECT: BARNSTEAD X-A001(180), 16200 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 10, 2012 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: NH 28, NH 126 AND WES LOCKE ROAD IN BARNSTEAD COMPLETION DATE: JUNE 28, 2013 A CONNIES SEPTIC SERVICE, INC. D/B/A CSSI 513 DONALD ST., BEDFORD, NH 03110 $ 817,424.87 B F.L. MERRILL CONSTRUCTION, INC. 61. SAND RD., PEMBROKE, NH 03275 $ 820,139.89 C WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 825,501.61 D AMERICAN EXCAVATING CORPORATION 5 MADDEN RD., PO BOX 1220, DERRY, NH 03820 $ 827,777.45 E G.W. BROOKS AND SON, INC. 362 EATON RD., FREEDOM, NH 03836 $ 838,184.01 F PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 839,725.77 G J. PARKER & DAUGHTERS, INC. 70 DAROSKA RD., PITTSFIELD, NH 03263 $ 845,562.30 H NORTHEAST EARTH MECHANICS, INC. 15. BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 848,469.62 I CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 1,085,054.00 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 201.1 CLEARING AND GRUBBING (F) A .8 10,000.00 8,000.00 4,500.00 3,600.00 11,500.00 9,200.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 12. 12.00 144.00 23.00 276.00 100.00 1,200.00 203.1 COMMON EXCAVATION CY 4,600. 15.00 69,000.00 7.50 34,500.00 14.50 66,700.00 203.6 EMBANKMENT-IN-PLACE (F) CY 650. 7.00 4,550.00 3.00 1,950.00 8.50 5,525.00 206.1 COMMON STRUCTURE EXCAVATION CY 36. 20.00 720.00 27.00 972.00 25.00 900.00 209.1 GRANULAR BACKFILL CY 50. 20.00 1,000.00 18.00 900.00 27.00 1,350.00 214. FINE GRADING U 1. 15,000.00 15,000.00 10,500.00 10,500.00 29,000.00 29,000.00 304.1 SAND (F) CY 1,640. 12.00 19,680.00 10.00 16,400.00 30.00 49,200.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 450. 20.00 9,000.00 25.00 11,250.00 35.00 15,750.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 50. 22.00 1,100.00 36.00 1,800.00 35.00 1,750.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 975. 20.00 19,500.00 19.00 18,525.00 35.00 34,125.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 1,550. 18.00 27,900.00 14.00 21,700.00 31.00 48,050.00 16200 PAGE 2 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 800. 78.00 62,400.00 81.00 64,800.00 78.00 62,400.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 1,100. 86.00 94,600.00 86.00 94,600.00 82.00 90,200.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 140.00 10,500.00 116.00 8,700.00 150.00 11,250.00 403.6 PAVEMENT JOINT ADHESIVE LF 13,000. .28 3,640.00 1.25 16,250.00 .40 5,200.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,900. 76.00 144,400.00 76.00 144,400.00 82.00 155,800.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 100. 82.00 8,200.00 116.00 11,600.00 86.00 8,600.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,200. 7.00 8,400.00 6.25 7,500.00 10.00 12,000.00 520.1 CONCRETE CLASS A CY 15. 200.00 3,000.00 500.00 7,500.00 1,150.00 17,250.00 544.1 REINFORCING STEEL (ROADWAY) LB 340. 2.00 680.00 2.00 680.00 6.50 2,210.00 585.3 STONE FILL, CLASS C CY 10. 40.00 400.00 30.00 300.00 85.00 850.00 585.4 STONE FILL, CLASS D CY 25. 40.00 1,000.00 35.00 875.00 74.00 1,850.00 608.26 6" CONCRETE SIDEWALK (F) SY 42. 65.00 2,730.00 65.00 2,730.00 50.00 2,100.00 609.01187 STRAIGHT GRANITE CURB, 18" HIGH W/3" ROUNDED EDGE LF 140. 52.00 7,280.00 64.00 8,960.00 38.00 5,320.00 609.02187 CURVED GRANITE CURB 18" HIGH W/3" ROUNDED EDGE LF 19. 60.00 1,140.00 61.00 1,159.00 92.00 1,748.00 614.512 CONCRETE PULL BOX 18" EA 10. 500.00 5,000.00 325.00 3,250.00 550.00 5,500.00 614.522 MOLDED PULL BOX 13"X24" EA 7. 330.00 2,310.00 280.00 1,960.00 370.00 2,590.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 600. 8.00 4,800.00 5.00 3,000.00 8.50 5,100.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 350. 14.00 4,900.00 13.00 4,550.00 16.00 5,600.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 86. 50.00 4,300.00 126.00 10,836.00 149.00 12,814.00 615.03 TRAFFIC SIGN TYPE C (F) SF 162.75 42.00 6,835.50 42.00 6,835.50 52.00 8,463.00 615.05 TRAFFIC SIGN TYPE BB (F) SF 20. 40.00 800.00 27.00 540.00 30.00 600.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 33.82 40.00 1,352.80 16.00 541.12 17.80 602.00 616.101 TRAFFIC SIGNALS U 1. 80,000.00 80,000.00 81,000.00 81,000.00 90,000.00 90,000.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 618.7 FLAGGERS HR 1,700. 12.00 20,400.00 21.00 35,700.00 25.00 42,500.00 619.1 MAINTENANCE OF TRAFFIC U 1. 30,000.00 30,000.00 19,500.00 19,500.00 16,350.00 16,350.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 1,500.00 4,500.00 3,500.00 10,500.00 3,200.00 9,600.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 1,200.00 2,400.00 1,900.00 3,800.00 2,200.00 4,400.00 621.31 SINGLE DELINEATOR WITH POST EA 10. 40.00 400.00 31.00 310.00 37.00 370.00 622.1 STEEL WITNESS MARKERS EA 7. 25.00 175.00 30.00 210.00 31.00 217.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,100. 1.00 1,100.00 2.00 2,200.00 .90 990.00 16200 PAGE 3 ------------------------------------------------------------------------------------------------------------------------------------ ITEM G H I NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL ------------------------------------------------------------------------------------------------------------------------------------ 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 16,000. .14 2,240.00 .15 2,400.00 .15 2,400.00 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 140. 4.00 560.00 2.50 350.00 4.50 630.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 350. 12.00 4,200.00 5.00 1,750.00 14.00 4,900.00 645.3 EROSION STONE TON 75. 35.00 2,625.00 48.00 3,600.00 36.00 2,700.00 645.531 SILT FENCE LF 4,200. 2.00 8,400.00 2.00 8,400.00 3.00 12,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 3,000.00 3,000.00 1,900.00 1,900.00 2,500.00 2,500.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 50.00 1,000.00 68.00 1,360.00 80.00 1,600.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1. 2,600.00 2,600.00 1,750.00 1,750.00 2,600.00 2,600.00 647.1 HUMUS CY 475. 12.00 5,700.00 8.00 3,800.00 44.00 20,900.00 692. MOBILIZATION U 1. 52,000.00 52,000.00 79,000.00 79,000.00 109,000.00 109,000.00 698.13 FIELD OFFICE TYPE C MON 10. 1,000.00 10,000.00 700.00 7,000.00 2,000.00 20,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 $845,562.30 $848,469.62 $1,085,054.00 STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION A-PS&E COMPARISION PROJECT: BARNSTEAD X-A001(180), 16200 COUNTIES AND CODES: BELKNAP 001 DATE BIDS OPEN: OCTOBER 10, 2012 SCOPE OF WORK: ROADWAY IMPROVEMENTS LOCATION: NH 28, NH 126 AND WES LOCKE ROAD IN BARNSTEAD COMPLETION DATE: JUNE 28, 2013 A CONNIES SEPTIC SERVICE, INC. D/B/A CSSI 513 DONALD ST., BEDFORD, NH 03110 $ 817,424.87 B F.L. MERRILL CONSTRUCTION, INC. 61. SAND RD., PEMBROKE, NH 03275 $ 820,139.89 C WEAVER BROS. CONST. CO., INC. PO BOX 1326, CONCORD, NH 03302 $ 825,501.61 D AMERICAN EXCAVATING CORPORATION 5 MADDEN RD., PO BOX 1220, DERRY, NH 03820 $ 827,777.45 E G.W. BROOKS AND SON, INC. 362 EATON RD., FREEDOM, NH 03836 $ 838,184.01 F PIKE INDUSTRIES, INC. 3 EASTGATE PARK ROAD, BELMONT, NH 03220 $ 839,725.77 G J. PARKER & DAUGHTERS, INC. 70 DAROSKA RD., PITTSFIELD, NH 03263 $ 845,562.30 H NORTHEAST EARTH MECHANICS, INC. 15. BARNSTEAD ROAD, PITTSFIELD, NH 03263 $ 848,469.62 I CPM CONSTRUCTORS PO BOX B, FREEPORT, ME 04032 $ 1,085,054.00 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 201.1 CLEARING AND GRUBBING (F) A .8 10,375.00 8,300.00 5,000.00 4,000.00 4,300.00 202.42 REMOVAL OF EXISTING PIPE OVER 24" DIAMETER LF 12. 20.00 240.00 15.00 180.00 60.00 203.1 COMMON EXCAVATION CY 4,600. 4.00 18,400.00 9.00 41,400.00 -23,000.00 203.6 EMBANKMENT-IN-PLACE (F) CY 650. 10.00 6,500.00 6.00 3,900.00 2,600.00 206.1 COMMON STRUCTURE EXCAVATION CY 36. 20.00 720.00 20.00 720.00 209.1 GRANULAR BACKFILL CY 50. 50.00 2,500.00 30.00 1,500.00 1,000.00 214. FINE GRADING U 1. 6,000.00 6,000.00 10,000.00 10,000.00 -4,000.00 304.1 SAND (F) CY 1,640. 12.00 19,680.00 15.00 24,600.00 -4,920.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 450. 25.00 11,250.00 25.00 11,250.00 304.35 CRUSHED GRAVEL FOR DRIVES CY 50. 35.00 1,750.00 35.00 1,750.00 304.4 CRUSHED STONE (FINE GRADATION) (F) CY 975. 22.00 21,450.00 21.00 20,475.00 975.00 304.5 CRUSHED STONE (COARSE GRADATION) (F) CY 1,550. 18.50 28,675.00 23.00 35,650.00 -6,975.00 16200 PAGE 2 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 403.11 HOT BITUMINOUS PAVEMENT, MACHINE METHOD TON 800. 86.00 68,800.00 80.00 64,000.00 4,800.00 403.1109 HOT BITUMINOUS PAVEMENT, MACHINE METHOD, HIGH STRENGTH TON 1,100. 89.50 98,450.00 85.00 93,500.00 4,950.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 75. 130.00 9,750.00 125.00 9,375.00 375.00 403.6 PAVEMENT JOINT ADHESIVE LF 13,000. .30 3,900.00 .45 5,850.00 -1,950.00 403.98 HOT BITUMINOUS CONCRETE LEVELING, MACHINE METHOD TON 1,900. 76.00 144,400.00 80.00 152,000.00 -7,600.00 411.1 HOT BITUMINOUS CONCRETE LEVELING COURSE TON 100. 125.00 12,500.00 85.00 8,500.00 4,000.00 417. COLD PLANING BITUMINOUS SURFACES SY 1,200. 6.00 7,200.00 5.00 6,000.00 1,200.00 520.1 CONCRETE CLASS A CY 15. 300.00 4,500.00 450.00 6,750.00 -2,250.00 544.1 REINFORCING STEEL (ROADWAY) LB 340. 2.00 680.00 2.50 850.00 -170.00 585.3 STONE FILL, CLASS C CY 10. 50.00 500.00 30.00 300.00 200.00 585.4 STONE FILL, CLASS D CY 25. 50.00 1,250.00 30.00 750.00 500.00 608.26 6" CONCRETE SIDEWALK (F) SY 42. 75.00 3,150.00 45.00 1,890.00 1,260.00 609.01187 STRAIGHT GRANITE CURB, 18" HIGH W/3" ROUNDED EDGE LF 140. 60.00 8,400.00 45.00 6,300.00 2,100.00 609.02187 CURVED GRANITE CURB 18" HIGH W/3" ROUNDED EDGE LF 19. 70.00 1,330.00 45.00 855.00 475.00 614.512 CONCRETE PULL BOX 18" EA 10. 500.00 5,000.00 700.00 7,000.00 -2,000.00 614.522 MOLDED PULL BOX 13"X24" EA 7. 350.00 2,450.00 300.00 2,100.00 350.00 614.73114 3" PVC CONDUIT, SCHEDULE 40 LF 600. 8.00 4,800.00 7.50 4,500.00 300.00 614.73118 3" PVC CONDUIT, SCHEDULE 80 LF 350. 15.00 5,250.00 8.50 2,975.00 2,275.00 615.022 TRAFFIC SIGN TYPE B, BREAKAWAY MOUNTS (F) SF 86. 130.00 11,180.00 80.00 6,880.00 4,300.00 615.03 TRAFFIC SIGN TYPE C (F) SF 162.75 45.00 7,323.75 40.00 6,510.00 813.75 615.05 TRAFFIC SIGN TYPE BB (F) SF 20. 27.00 540.00 15.00 300.00 240.00 615.06 TRAFFIC SIGN TYPE CC (F) SF 33.82 16.00 541.12 15.00 507.30 33.82 616.101 TRAFFIC SIGNALS U 1. 80,250.00 80,250.00 90,000.00 90,000.00 -9,750.00 618.61 UNIFORMED OFFICERS WITH VEHICLE $ 1. 30,000.00 30,000.00 30,000.00 30,000.00 618.7 FLAGGERS HR 1,700. 22.00 37,400.00 20.00 34,000.00 3,400.00 619.1 MAINTENANCE OF TRAFFIC U 1. 15,000.00 15,000.00 20,000.00 20,000.00 -5,000.00 619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 3. 2,000.00 6,000.00 1,250.00 3,750.00 2,250.00 619.27 TRAILER-MOUNTED SPEED LIMIT SIGN U 2. 4,100.00 8,200.00 2,000.00 4,000.00 4,200.00 621.31 SINGLE DELINEATOR WITH POST EA 10. 75.00 750.00 30.00 300.00 450.00 622.1 STEEL WITNESS MARKERS EA 7. 50.00 350.00 25.00 175.00 175.00 628.2 SAWED BITUMINOUS PAVEMENT LF 1,100. 2.00 2,200.00 1.25 1,375.00 825.00 632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 16,000. .25 4,000.00 .20 3,200.00 800.00 16200 PAGE 3 A-BIDDER PS&E ----------------------- ----------------------- A-PS&E ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT DIFFERENCE 632.3118 RETROREFLECT. THERMOPLAS. PAVE. MARKING, 18" LINE LF 140. 5.50 770.00 3.00 420.00 350.00 632.32 RETROREFLECT. THERMOPLAS. PAVEMENT MARKING, SYMBOL OR WORD SF 350. 7.70 2,695.00 5.00 1,750.00 945.00 645.3 EROSION STONE TON 75. 50.00 3,750.00 35.00 2,625.00 1,125.00 645.531 SILT FENCE LF 4,200. 3.00 12,600.00 3.00 12,600.00 645.7 STORM WATER POLLUTION PREVENTION PLAN U 1. 2,200.00 2,200.00 3,000.00 3,000.00 -800.00 645.71 MONITORING SWPPP AND EROSION AND SEDIMENT CONTROLS HR 20. 75.00 1,500.00 75.00 1,500.00 646.3 TURF ESTABLISHMENT WITH MULCH AND TACKIFIERS A 1. 3,200.00 3,200.00 4,000.00 4,000.00 -800.00 647.1 HUMUS CY 475. 12.00 5,700.00 25.00 11,875.00 -6,175.00 692. MOBILIZATION U 1. 33,500.00 33,500.00 50,000.00 50,000.00 -16,500.00 698.13 FIELD OFFICE TYPE C MON 10. 1,000.00 10,000.00 1,300.00 13,000.00 -3,000.00 699. MISCELLANEOUS TEMPORARY EROSION AND SEDIMENT CONTROL $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.15 FUEL ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 1010.2 ASPHALT CEMENT ADJUSTMENT $ 1. 10,000.00 10,000.00 10,000.00 10,000.00 $817,424.87 $860,687.30 -43,262.43